• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1910.217(e)(1) Inspection and Maintenance Records

OSHA 1910 General Industry > O Machinery and Machine Guarding > 1910.217 Mechanical Power Presses > 1910.217(e) Inspection, Maintenance, and Modification of Presses > 1910.217(e)(1) Inspection and Maintenance Records
JUMP TO FULL CODE CHAPTER
The employer shall establish and follow an inspection program having a general component and a directed component.

1910.217(e)(1)(i)

Under the general component of the inspection program, the employer shall:

1910.217(e)(1)(i)(A)

Conduct periodic and regular inspections of each power press to ensure that all of its parts, auxiliary equipment, and safeguards, including the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism, are in a safe operating condition and adjustment;

1910.217(e)(1)(i)(B)

Perform and complete necessary maintenance or repair, or both, before operating the press; and

1910.217(e)(1)(i)(C)

Maintain a certification record of each inspection, and each maintenance and repair task performed, under the general component of the inspection program that includes the date of the inspection, maintenance, or repair work, the signature of the person who performed the inspection, maintenance, or repair work, and the serial number, or other identifier, of the power press inspected, maintained, and repaired.

1910.217(e)(1)(iii)

Paragraph (e)(1)(ii) of this section does not apply to presses that comply with paragraphs (b)(13) and (14) of this section.

1910.217(e)(1)(ii)

Under the directed component of the inspection program, the employer shall:

1910.217(e)(1)(ii)(A)

Inspect and test each press on a regular basis at least once a week to determine the condition of the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism;

1910.217(e)(1)(ii)(B)

Perform and complete necessary maintenance or repair, or both, on the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism before operating the press; and

1910.217(e)(1)(ii)(C)

Maintain a certification record of each maintenance task performed under the directed component of the inspection program that includes the date of the maintenance task, the signature of the person who performed the maintenance task, and the serial number, or other identifier, of the power press maintained.

Note to paragraph (e)(1)(ii): Inspections of the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism conducted under the directed component of the inspection program are exempt from the requirement to maintain certification records specified by paragraph (e)(1)(i)(C) of this section, but inspections of the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism conducted under the general component of the inspection program are not exempt from this requirement.

Related Code Sections


1910.217(e)(1) Machinery and Machine Guarding, Inspection and Maintenance Records
; and Maintain a certification record of each inspection, and each maintenance and repair task performed ...
OSHA 1910 General Industry > O Machinery and Machine Guarding > 1910.217 Mechanical Power Presses > 1910.217(e) Inspection, Maintenance, and Modification of Presses > 1910.217(e)(1) Inspection and Maintenance Records
1910.217(e)(1)(i)(B) Machinery and Machine Guarding,
Perform and complete necessary maintenance or repair, or both, before operating the press; and ...
OSHA 1910 General Industry > O Machinery and Machine Guarding > 1910.217 Mechanical Power Presses > 1910.217(e) Inspection, Maintenance, and Modification of Presses > 1910.217(e)(1) Inspection and Maintenance Records > 1910.217(e)(1)(i) > 1910.217(e)(1)(i)(B)
1910.217(e)(1)(ii)(A) Machinery and Machine Guarding,
Inspect and test each press on a regular basis at least once a week to determine the condition of the clutch/brake mechanism, antirepeat feature ...
OSHA 1910 General Industry > O Machinery and Machine Guarding > 1910.217 Mechanical Power Presses > 1910.217(e) Inspection, Maintenance, and Modification of Presses > 1910.217(e)(1) Inspection and Maintenance Records > 1910.217(e)(1)(ii) > 1910.217(e)(1)(ii)(A)
1910.217(e)(1)(ii)(B) Machinery and Machine Guarding,
Perform and complete necessary maintenance or repair, or both, on the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism before ...
OSHA 1910 General Industry > O Machinery and Machine Guarding > 1910.217 Mechanical Power Presses > 1910.217(e) Inspection, Maintenance, and Modification of Presses > 1910.217(e)(1) Inspection and Maintenance Records > 1910.217(e)(1)(ii) > 1910.217(e)(1)(ii)(B)
1910.217(e)(1)(iii) Machinery and Machine Guarding,
Paragraph (e)(1)(ii) of this section does not apply to presses that comply with paragraphs (b)(13) and (14) of this section ...
OSHA 1910 General Industry > O Machinery and Machine Guarding > 1910.217 Mechanical Power Presses > 1910.217(e) Inspection, Maintenance, and Modification of Presses > 1910.217(e)(1) Inspection and Maintenance Records > 1910.217(e)(1)(iii)
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE