// CODE SNIPPET
1908.9.1 Initial Curing
JUMP TO FULL CODE CHAPTER
Shotcrete shall be kept continuously moist for 24 hours after shotcreting is complete or shall be sealed with an approved curing compound.
Related Code Sections
1908.9.1 Concrete, Initial Curing
Shotcrete shall be kept continuously moist for 24 hours after shotcreting is complete or shall be sealed with an approved curing compound ...
Building Code 2018 of Illinois > 19 Concrete > 1908 Shotcrete > 1908.9 Curing > 1908.9.1 Initial Curing
26.5.3 Construction Documents and Inspection, Curing
' by more than 500 psi.
Shotcrete shall be cured in accordance with (1) through (3).
For 24 hours from completion of placement, initial ...
Building Code Requirements for Structural Concrete of Illinois > 26 Construction Documents and Inspection > 26.5 Concrete Production and Construction > 26.5.3 Curing
2512.8.2 Gypsum Board, Gypsum Panel Products and Plaster, Curing
Curing of the first coat is permitted to be omitted and the second coat shall be cured as set forth in ASTM C926 and Table 2512.6 ...
Building Code 2021 of Illinois > 25 Gypsum Board, Gypsum Panel Products and Plaster > 2512 Exterior Plaster > 2512.8 Alternate Method of Application > 2512.8.2 Curing
2512.8.2 Gypsum Board, Gypsum Panel Products and Plaster, Curing
Curing of the first coat is permitted to be omitted and the second coat shall be cured as set forth in ASTM C926 and Table 2512.6 ...
Building Code 2018 of Illinois > 25 Gypsum Board, Gypsum Panel Products and Plaster > 2512 Exterior Plaster > 2512.8 Alternate Method of Application > 2512.8.2 Curing
1908.9.3 Concrete, Natural Curing
Natural curing shall not be used in lieu of that specified in this section unless the relative humidity remains at or above 85 percent ...
Building Code 2018 of Illinois > 19 Concrete > 1908 Shotcrete > 1908.9 Curing > 1908.9.3 Natural Curing