• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1618.3.1 Implementation

NYC Building Code 2014 > 16 Structural Design > 1618 Loads on Temporary Installations > 1618.3 Action Plan > 1618.3.1 Implementation
JUMP TO FULL CODE CHAPTER
The action plan shall be such that it may be reliably implemented in one day's notice or less as appropriate for the actions.

Related Code Sections


1618.3.1 Structural Design, Implementation
The action plan shall be such that it may be reliably implemented in one day's notice or less as appropriate for the actions ...
NYC Building Code 2014 > 16 Structural Design > 1618 Loads on Temporary Installations > 1618.3 Action Plan > 1618.3.1 Implementation
1704.2.1 Structural Tests and Special Inspections, Fabrication and Implementation Procedures
The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis ...
NYC Building Code 2008 > 17 Structural Tests and Special Inspections > 1704 Special Inspections > 1704.2 Inspection of Fabricators > 1704.2.1 Fabrication and Implementation Procedures
1704.2.1 Structural Tests and Special Inspections, Fabrication and Implementation Procedures
The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis ...
NYC Building Code 2014 > 17 Structural Tests and Special Inspections > 1704 Special Inspections > 1704.2 Inspection of Fabricators > 1704.2.1 Fabrication and Implementation Procedures
**§28-103.29 Administration, Reporting Regarding Implementation of Section 3321 of the New York City Building Code
of the council, and make publicly available online, a report on implementation of section 3321 of the New York city building code. In ...
NYC General Admin. Provisions 2014 > 1 Administration > 103 Duties and Powers of Commissioner of Buildings > **§28-103.29 Reporting Regarding Implementation of Section 3321 of the New York City Building Code
*§28-504.7 Miscellaneous Provisions, Filing of Plan
The department or department of transportation may require that plans implemented pursuant to the provisions of this article be filed with either ...
NYC General Admin. Provisions 2008 > 5 Miscellaneous Provisions > 504 *Bicycle Access to Office Buildings > *§28-504.7 Filing of Plan
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE