1926.1431(h)(4) Immediately After the Trial Lift, the Competent Person Must:
JUMP TO FULL CODE CHAPTER
Conduct a visual inspection of the equipment, base support or ground, and personnel platform, to determine whether the trial lift has exposed any defect or problem or produced any adverse effect.
Confirm that, upon the completion of the trial lift process, the test weight has been removed.
Related Code Sections
1926.1431(h)(4) Cranes & Derricks in Construction, Immediately After the Trial Lift, the Competent Person Must:
Conduct a visual inspection of the equipment, base support or ground, and personnel platform, to determine whether the trial lift has exposed any ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1431 Hoisting Personnel > 1926.1431(h) Trial Lift and Inspection > 1926.1431(h)(4) Immediately After the Trial Lift, the Competent Person Must:
1926.1431(h)(5)(i) Cranes & Derricks in Construction,
The platform must be hoisted a few inches with the personnel and materials/tools on board and inspected by a competent person to ensure ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1431 Hoisting Personnel > 1926.1431(h) Trial Lift and Inspection > 1926.1431(h)(5) Immediately Prior to Each Lift: > 1926.1431(h)(5)(i)
1926.1431(h)(5)(ii) Cranes & Derricks in Construction,
The following conditions must be determined by a competent person to exist before the lift of personnel proceeds ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1431 Hoisting Personnel > 1926.1431(h) Trial Lift and Inspection > 1926.1431(h)(5) Immediately Prior to Each Lift: > 1926.1431(h)(5)(ii)
1926.1431(h)(3) Cranes & Derricks in Construction, The Competent Person Must Determine That:
in the course of the trial lift ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1431 Hoisting Personnel > 1926.1431(h) Trial Lift and Inspection > 1926.1431(h)(3) The Competent Person Must Determine That:
1926.1431(j) Cranes & Derricks in Construction, Proof Testing
After proof testing, a competent person must inspect the platform and rigging to determine ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1431 Hoisting Personnel > 1926.1431(j) Proof Testing