• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1910.304(g)(1)(iv)(D) If a Service Conductor Is Uninsulated

OSHA 1910 General Industry > S Electrical > 1910.304 Wiring Design and Protection > 1910.304(g) Grounding > 1910.304(g)(1) Systems to Be Grounded > 1910.304(g)(1)(iv) > 1910.304(g)(1)(iv)(D) If a Service Conductor Is Uninsulated
JUMP TO FULL CODE CHAPTER

Related Code Sections


1910.304(g)(1)(iv)(D) Electrical, If a Service Conductor Is Uninsulated
OSHA 1910 General Industry > S Electrical > 1910.304 Wiring Design and Protection > 1910.304(g) Grounding > 1910.304(g)(1) Systems to Be Grounded > 1910.304(g)(1)(iv) > 1910.304(g)(1)(iv)(D) If a Service Conductor Is Uninsulated
1910.268(s)(22) Special Industries, Insulated
Otherwise, it is, within the purpose of these rules, uninsulated. Insulating coverings of conductors in one means of making the conductor insulated ...
OSHA 1910 General Industry > R Special Industries > 1910.268 Telecommunications > 1910.268(s) Definitions > 1910.268(s)(22) Insulated
1910.269(q)(1) Special Industries, General
of equipment may impose, the employer shall ascertain that the structures are capable of sustaining the additional or unbalanced stresses. If the pole ...
OSHA 1910 General Industry > R Special Industries > 1910.269 Electric Power Generation, Transmission, and Distribution > 1910.269(q) Overhead Lines and Live-Line Barehand Work > 1910.269(q)(1) General
1910.335(b) Electrical, Alerting Techniques
in conjunction with safety signs where it is necessary to prevent or limit employee access to work areas exposing employees to uninsulated energized conductors ...
OSHA 1910 General Industry > S Electrical > 1910.335 Safeguards for Personnel Protection > 1910.335(b) Alerting Techniques
1910.304(g) Electrical, Grounding
; If the system is nominally rated three-phase, four-wire wye connected in which the neutral is used as a circuit conductor ...
OSHA 1910 General Industry > S Electrical > 1910.304 Wiring Design and Protection > 1910.304(g) Grounding
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE