• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

3307.4 Hours of Operation

NYC Fire Code 2014 > 33 Explosives, Fireworks and Special Effects > 3307 Blasting Operations > 3307.4 Hours of Operation
JUMP TO FULL CODE CHAPTER
Blasting operations shall be conducted between the hours of 7:00 am (0700 hours) and 7:00 pm (1900 hours), Monday through Saturday. The written authorization of the commissioner shall be required in order to conduct blasting operations at any other times, or on Sunday, and may be granted or revoked by the commissioner in the interest of public safety.

Related Code Sections


106.7 Administration, Boilers
Construction documents for boiler installations shall indicate the output capacity in BTU per hour, the operating weight of each boiler, the pressure ...
NYC Mechanical Code 2008 > 1 Administration > 106 Construction Documents > 106.7 Boilers
106.7 Administration, Boilers
Construction documents for boiler installations shall indicate the output capacity in BTU per hour, the operating weight of each boiler, the pressure ...
NYC Mechanical Code 2014 > 1 Administration > 106 Construction Documents > 106.7 Boilers
§28-117.4.1 Administration, Presumption
ingress and egress to such place of assembly for security purposes during the hours of operation of such establishment; and/or Protection of such place ...
NYC General Admin. Provisions 2014 > 1 Administration > 117 Places of Assembly > §28-117.4 Security Guards > §28-117.4.1 Presumption
§28-117.4.1 Administration, Presumption
to manage ingress and egress to such place of assembly for security purposes during the hours of operation of such establishment ...
NYC General Admin. Provisions 2008 > 1 Administration > 117 Places of Assembly > §28-117.4 Security Guards > §28-117.4.1 Presumption
3307.5.1 Safeguards During Construction or Demolition, Watchperson
), a competent watchperson shall be on duty at the site during all hours when operations are not in progress. Where the construction or demolition area ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3307 Protection of Pedestrians > 3307.5 Watchperson and Flagperson > 3307.5.1 Watchperson
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE