708.3.1 Horizontal Drains Within Buildings and Building Sewers
JUMP TO FULL CODE CHAPTER
All horizontal drains within buildings and building sewers shall be provided with cleanouts located not more than 100 feet (30 480 mm) apart.
For underground piping that is more than 10 inches in diameter, manholes shall be provided and located at every major change of direction, grade, elevation, or size of pipe or at intervals of not more than 400 feet (12 1920 mm). Metal covers shall be provided for the manholes and shall be of sufficient weight to meet local traffic and loading conditions.
Within buildings, manhole covers shall be gastight and the manhole shall be vented with not less than a 4-inch (102 mm) pipe.
R 408.30757
For underground piping that is more than 10 inches in diameter, manholes shall be provided and located at every major change of direction, grade, elevation, or size of pipe or at intervals of not more than 400 feet (12 1920 mm). Metal covers shall be provided for the manholes and shall be of sufficient weight to meet local traffic and loading conditions.
Within buildings, manhole covers shall be gastight and the manhole shall be vented with not less than a 4-inch (102 mm) pipe.
R 408.30757
Related Code Sections
708.3.1 Sanitary Drainage, Horizontal Drains Within Buildings and Building Sewers
All horizontal drains within buildings and building sewers shall be provided with cleanouts located not more than 100 feet (30 480 mm) apart. For ...
2015 Michigan Plumbing Code > 7 Sanitary Drainage > 708 Cleanouts > 708.3 Where Required > 708.3.1 Horizontal Drains Within Buildings and Building Sewers
P3005.2.4 Sanitary Drainage, Changes of Direction
Where a horizontal
drainage pipe, a building drain or a building sewer has a
change of horizontal direction greater than 45 degrees (0.79
rad ...
2015 Michigan Residential Code > 30 Sanitary Drainage > P3005 Drainage System > P3005.2 Cleanouts Required > P3005.2.4 Changes of Direction
Section 703 Sanitary Drainage, Building Sewer
Where a building sewer or building drain is installed on filled or unstable ground, the drainage pipe shall conform ...
708.1.3 Sanitary Drainage, Building Drain and Building Sewer Junction
The junction of the building drain and the building sewer
shall be served by a cleanout that is located at the junction
or within 10 feet (3048 ...
2015 Michigan Plumbing Code > 7 Sanitary Drainage > 708 Cleanouts > 708.1 Cleanouts Required > 708.1.3 Building Drain and Building Sewer Junction
P3005.2.3 Sanitary Drainage, Building Drain and Building Sewer Junction
The junction of the building drain and the building sewer
shall be served by a cleanout that is located at the junction
or within 10 feet (3048 ...
2015 Michigan Residential Code > 30 Sanitary Drainage > P3005 Drainage System > P3005.2 Cleanouts Required > P3005.2.3 Building Drain and Building Sewer Junction