// CODE SNIPPET
P-507.3 Horizontal Drains
JUMP TO FULL CODE CHAPTER
Cleanouts in horizontal drainage lines of 4-inch nominal diameter or less shall not be
more than 50 feet apart and not more than 100 feet apart for larger pipe sizes. Cleanout as required in Section P-507.1
shall be accepted to satisfy this requirement.
Related Code Sections
P-507.3 Traps, Cleanouts, Interceptors, and Backwater Valves, Horizontal Drains
Cleanouts in horizontal drainage lines of 4-inch nominal diameter or less shall not be
more than 50 feet apart and not more than 100 feet apart ...
Philadelphia Plumbing Code > 5 Traps, Cleanouts, Interceptors, and Backwater Valves > P-507 Cleanouts > P-507.3 Horizontal Drains
P3005.2.1 Sanitary Drainage, Horizontal Drains and Building Drains
Horizontal drainage pipes in buildings shall have cleanouts located at intervals of not more than 100 feet (30 480 mm). Building drains shall have ...
2018 Philadelphia Residential Code > 30 Sanitary Drainage > P3005 Drainage System > P3005.2 Cleanouts Required > P3005.2.1 Horizontal Drains and Building Drains
905.3 Vents, Vent Connection to Drainage System
Every dry vent connecting to a horizontal drain shall connect above the centerline of the horizontal drain pipe ...
Plumbing Code 2018 of Philadelphia > 9 Vents > 905 Vent Connections and Grades > 905.3 Vent Connection to Drainage System
P3104.3 Vents, Vent Connection to Drainage System
A dry vent connecting to a horizontal drain shall connect above the centerline of the horizontal drain pipe ...
2018 Philadelphia Residential Code > 31 Vents > P3104 Vent Connections and Grades > P3104.3 Vent Connection to Drainage System
914.1 Vents, Circuit Vent Permitted
Not more than eight fixtures connected to a horizontal branch drain shall be permitted to be circuit vented. Each fixture drain shall connect ...