1905.11.2 High-Early-Strength
JUMP TO FULL CODE CHAPTER
High-early-strength concrete shall be maintained above 50°F (10°C) and in a moist condition for at least the first three days, except when cured in accordance with Section 1905.11.3.
Related Code Sections
1905.11.2 Concrete, High-Early-Strength
High-early-strength concrete shall be maintained above 50°F (10°C) and in a moist condition for at least the first three days, except when cured ...
NYC Building Code 2008 > 19 Concrete > 1905 Concrete Quality, Mixing and Placing > 1905.11 Curing > 1905.11.2 High-Early-Strength
1905.11.2 Concrete, High-Early-Strength
High-early-strength concrete shall be maintained above 50°F (10°C) and in a moist condition for at least the first three days, except when cured ...
NYC Building Code 2014 > 19 Concrete > 1905 Concrete Quality, Mixing and Placing > 1905.11 Curing > 1905.11.2 High-Early-Strength
1913.9.2 Concrete, Final Curing
Final curing shall continue for seven days after shotcreting, or for three days if high-early-strength cement is used, or until the specified ...
1914.9.2 Concrete, Final Curing
Final curing shall continue for seven days after shotcreting, or for three days if high-early-strength cement is used, or until the specified ...
1914.9 Concrete, Curing
Final curing shall continue for seven days after shotcreting, or for three days if high-early-strength cement is used, or until the specified ...