UpCodes logo
Go To Full Code Chapter
Continuous special inspections shall be performed during installation of helical pile foundations. The information recorded shall include installation equipment used, pile dimensions, tip elevations, final depth, final installation torque and other pertinent installation data as required by the registered design professional in responsible charge. The approved geotechnical report and the construction documents prepared by the registered design professional shall be used to determine compliance.

Related Code Sections

1705.9 Special Inspections and Tests, Helical Pile Foundations
Continuous special inspections shall be performed during installation of helical pile foundations. The information recorded shall include ...
1705.9 Special Inspections and Tests, Helical Pile Foundations
Continuous special inspections shall be performed during installation of helical pile foundations. The information recorded shall include ...
1810.4.12 Soils and Foundations, Special Inspection
, respectively. Special inspections in accordance with Section 1705.9 shall be provided for helical piles ...
1810.4.12 Soils and Foundations, Special Inspection
, respectively. Special inspections in accordance with Section 1705.9 shall be provided for helical piles ...
1810.3.1.5 Soils and Foundations, Helical Piles
Helical piles shall be designed and manufactured in accordance with accepted engineering practice to resist all stresses induced by installation ...