• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

3306.9.8 Hazards to Be Removed

NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3306 Demolition > 3306.9 Safeguards > 3306.9.8 Hazards to Be Removed
JUMP TO FULL CODE CHAPTER
Prior to the commencement of demolition operations, hazards shall be removed in accordance with Sections 3306.9.8.1 through 3306.9.8.4.

3306.9.8.1 Combustible Content

Prior to the commencement of demolition operations, the area authorized to be demolished by the work permit shall be thoroughly cleaned of combustible content and debris, including but not limited to building contents and exterior finishes, down to the structural elements.

3306.9.8.2 Asbestos

Prior to the commencement of demolition operations, all asbestos shall be removed from the area authorized to be demolished by the department work permit, and certification to that effect shall be filed with the department and the Department of Environmental Protection. Such asbestos removal shall be in accordance with Section 28-106 of the Administrative Code and rules promulgated by the commissioner of the Department of Environmental Protection.

3306.9.8.3 Glass

Prior to the commencement of demolition operations, all glass located in the area authorized to be demolished by the work permit, including but not limited to glass in windows, doors, skylights, and fixtures, shall be removed.

Exception: Demolition operations relating to the alteration, maintenance, or repair of a façade.

3306.9.8.4 Steam and Fuel

Prior to the commencement of demolition operations, all pipes, tanks, boilers, or similar devices containing steam or fuel and located in the area authorized to be demolished by the work permit shall be purged of such steam or fuel.

Exception: Pipes, tanks, boilers, or similar devices containing steam or fuel located in the area authorized to be demolished by the work permit and which will not be disturbed during the course of the demolition operation may, in lieu of being purged, be safeguarded so as to prevent their being damaged during the course of demolition operations.

Related Code Sections


3306.9.8 Safeguards During Construction or Demolition, Hazards to Be Removed
Prior to the commencement of demolition operations, hazards shall be removed in accordance with Sections 3306.9.8.1 through 3306.9.8.4 ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3306 Demolition > 3306.9 Safeguards > 3306.9.8 Hazards to Be Removed
3306.9.8 Safeguards During Construction or Demolition, Hazards to Be Removed
Hazards shall be removed in accordance with the following requirements: Before commencement of actual demolition, all glass in windows, doors ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3306 Demolition > 3306.9 Full Demolition and Partial Demolition Operations > 3306.9.8 Hazards to Be Removed
G102.3.1 Flood-Resistant Construction, Letters of Map Amendment (LOMA)
as being within the area of special flood hazard and shall not approve plans except in compliance with this appendix, unless a letter of map amendment ...
NYC Building Code 2014 > G Flood-Resistant Construction > G102 Applicability > G102.3 Letters of Map Change > G102.3.1 Letters of Map Amendment (LOMA)
G102.3 Flood-Resistant Construction, Letters of Map Change
elevation, the commissioner shall deem such structure or tax lot as being within the area of special flood hazard and shall not approve plans except ...
NYC Building Code 2008 > G Flood-Resistant Construction > G102 Applicability > G102.3 Letters of Map Change
G102.3.1 Flood-Resistant Construction, Letters of Map Amendment (LOMA)
as being within the area of special flood hazard and shall not approve plans except in compliance with this appendix, unless a letter of map amendment ...
NYC Building Code 2008 > G Flood-Resistant Construction > G102 Applicability > G102.3 Letters of Map Change > G102.3.1 Letters of Map Amendment (LOMA)
Help Contact Us Privacy Terms
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE