• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1910.265(c)(26)(vii) Guarding Hoistway Openings

OSHA 1910 General Industry > R Special Industries > 1910.265 Sawmills > 1910.265(c) Building Facilities, and Isolated Equipment > 1910.265(c)(26) Mechanical Stackers and Unstackers > 1910.265(c)(26)(vii) Guarding Hoistway Openings
JUMP TO FULL CODE CHAPTER
When the hoist platform or top of the load is below the working platform, the hoistway openings shall be guarded.

Related Code Sections


1910.265(c)(26)(vii) Special Industries, Guarding Hoistway Openings
When the hoist platform or top of the load is below the working platform, the hoistway openings shall be guarded ...
OSHA 1910 General Industry > R Special Industries > 1910.265 Sawmills > 1910.265(c) Building Facilities, and Isolated Equipment > 1910.265(c)(26) Mechanical Stackers and Unstackers > 1910.265(c)(26)(vii) Guarding Hoistway Openings
1910.303(g)(2) Electrical, Guarding of Live Parts
Except as elsewhere required or permitted by this standard, live parts of electric equipment operating at 50 volts or more shall be guarded against ...
OSHA 1910 General Industry > S Electrical > 1910.303 General > 1910.303(g) 600 Volts, Nominal, or Less > 1910.303(g)(2) Guarding of Live Parts
1910.176(g) Materials Handling and Storage, Guarding
Covers and/or guard- rails shall be provided to protect personnel from the hazards of open pits, tanks, vats, ditches, etc. [39 FR 23052, June ...
OSHA 1910 General Industry > N Materials Handling and Storage > 1910.176 Handling Materials - General > 1910.176(g) Guarding
1910.68(b)(9) Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms, Guards for Openings
The floor opening at each landing shall be guarded on sides not used for entrance or exit by a wall, a railing and toeboard or by panels of wire mesh ...
OSHA 1910 General Industry > F Powered Platforms, Manlifts, and Vehicle-Mounted Work Platforms > 1910.68 Manlifts > 1910.68(b) General Requirements > 1910.68(b)(9) Guards for Openings
1910.262(d)(1) Special Industries, Beater Guards
When any opening or picker machinery is equipped with a beater, such beater shall be provided with metal covers which will prevent contact ...
OSHA 1910 General Industry > R Special Industries > 1910.262 Textiles > 1910.262(d) Openers and Pickers > 1910.262(d)(1) Beater Guards
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE