• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

2904.4 Ground

Minnesota Fire Code 2015 > 29 Manufacture of Organic Coatings > 2904 Electrical Equipment and Protection > 2904.4 Ground
JUMP TO FULL CODE CHAPTER
Metal framing of buildings shall be grounded with resistance of not more than 5 ohms.

Related Code Sections


1404.11.4 Exterior Walls, Grounding
Grounding of metal veneers on buildings shall comply with the requirements of Chapter 27 of this code ...
2020 Minnesota Building Code > 14 Exterior Walls > 1404 Installation of Wall Coverings > 1404.11 Metal Veneers > 1404.11.4 Grounding
1405.11.4 Exterior Walls, Grounding
Grounding of metal veneers on buildings shall comply with the requirements of Chapter 27.of this code ...
Minnesota Building Code 2015 > 14 Exterior Walls > 1405 Installation of Wall Coverings > 1405.11 Metal Veneers > 1405.11.4 Grounding
2403.2.5 Flammable Finishes, Grounding
Metal parts of spray booths, exhaust ducts and piping systems conveying Class I or II liquids shall be electrically grounded in accordance with NFPA ...
2020 Minnesota State Fire Code > 24 Flammable Finishes > 2403 Protection of Operations > 2403.2 Sources of Ignition > 2403.2.5 Grounding
2403.2.5 Flammable Finishes, Grounding
Metal parts of spray booths, exhaust ducts and piping systems conveying Class I or II liquids shall be electrically grounded in accordance with NFPA ...
Minnesota Fire Code 2015 > 24 Flammable Finishes > 2403 Protection of Operations > 2403.2 Sources of Ignition > 2403.2.5 Grounding
2511.3 Gypsum Board, Gypsum Panel Products and Plaster, Grounds
Where installed, grounds shall ensure the minimum thickness of plaster as set forth in ASTM C842 and ASTM C926. Plaster thickness shall be measured ...
2020 Minnesota Building Code > 25 Gypsum Board, Gypsum Panel Products and Plaster > 2511 Interior Plaster > 2511.3 Grounds
Help Contact Us Privacy Terms
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE