• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

105.6 Full Demolition Permits

NYC Building Code 2014 > 1 Administration > 105 Permits > 105.6 Full Demolition Permits
JUMP TO FULL CODE CHAPTER
In addition to the requirements of Chapter 1 of Title 28 of the Administrative Code and Chapter 33 of this code, applications for full demolition permits shall include:
  1. Utility certifications. Certifications by the respective utility companies or governmental agencies having jurisdiction that all gas, electric, water, steam and other service lines to the building have been disconnected as required by Section 3303.2.5.
  2. Notice to adjoining owners. Proof of notice to adjoining owners as required by Section 3306.3.2.
  3. Certification of rodent extermination. Certification in accordance with department rules that the building has been treated effectively for rodent extermination as required by Section 3306.9.13.

105.6.1 Notice to Department of Commencement of Demolition Work

The full demolition permit shall be issued on the condition that the applicant will provide written notice to the department at least 48 hours prior to the commencement of demolition work.

Related Code Sections


**§28-106.1.1 Administration, Full Demolition Permit
The commissioner shall not issue a full demolition permit unless the owner of the building provides certification in a form and manner to be provided ...
NYC General Admin. Provisions 2008 > 1 Administration > 106 Asbestos > *§28-106.1 Asbestos Certification Required > **§28-106.1.1 Full Demolition Permit
*§28-106.1.1 Administration, Full Demolition Permit
The commissioner shall not issue a full demolition permit unless the owner of the building provides certification in a form and manner to be provided ...
NYC General Admin. Provisions 2014 > 1 Administration > 106 Asbestos > §28-106.1 Asbestos Certification Required > *§28-106.1.1 Full Demolition Permit
105.6 Administration, Full Demolition Permits
The full demolition permit shall be issued on the condition ...
NYC Building Code 2008 > 1 Administration > 105 Permits > 105.6 Full Demolition Permits
105.6 Administration, Full Demolition Permits
The full demolition permit shall be issued ...
NYC Building Code 2014 > 1 Administration > 105 Permits > 105.6 Full Demolition Permits
§28-105.2 Administration, Classification of Work Permits
, and foundation insulation.   4. Full demolition permits : for the full demolition of buildings or structures.   5. Plumbing ...
NYC General Admin. Provisions 2008 > 1 Administration > 105 Permits > §28-105.2 Classification of Work Permits
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE