An operational permit is required to operate a fruit- or crop-ripening facility or conduct a fruit-ripening process using ethylene gas.

Related Code Sections

105.5.20 Scope and Administration, Fruit and Crop Ripening
An operational permit is required to operate a fruit- or crop-ripening facility or conduct a fruit-ripening process using ethylene gas ...
105.6.18 Scope and Administration, Fruit and Crop Ripening
An operational permit is required to operate a fruit- or crop-ripening facility or conduct a fruit-ripening process using ethylene gas ...
Chapter 25 Fruit and Crop Ripening
and distribution systems and controlling ignition sources. Design and construction of facilities for fruit and crop ripening are regulated ...
Chapter 25 Fruit and Crop Ripening
storage and distribution systems and controlling ignition sources. Design and construction of facilities for fruit and crop ripening are regulated ...
Section 2501 Fruit and Crop Ripening, General
Ripening processes where ethylene gas is introduced into a room to promote the ripening of fruits, vegetables and other crops shall comply ...