• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

504.1.4 Frontage Space Obstructions

NYC Fire Code 2014 > 5 Fire Operations Features > 504 Building and Rooftop Access > 504.1 Frontage Space > 504.1.4 Frontage Space Obstructions
JUMP TO FULL CODE CHAPTER
Obstructions, such as planters, fences and bollards, shall not be placed in the required frontage space unless they have been approved by the Commissioner of Buildings, the Commissioner of Transportation, or the commissioner, as applicable.

Related Code Sections


501.3.1 General Building Heights and Areas; Separation of Occupancies, Frontage
the street or frontage space ...
NYC Building Code 2008 > 5 General Building Heights and Areas; Separation of Occupancies > 501 General > 501.3 Fire Department Access > 501.3.1 Frontage
501.3.1 General Building Heights and Areas; Separation of Occupancies, Frontage
as adjoining the street or frontage space ...
NYC Building Code 2014 > 5 General Building Heights and Areas; Separation of Occupancies > 501 General > 501.3 Fire Department Access > 501.3.1 Frontage
§27-291 Building Limitations, Frontage
a street or frontage space. For the purposes of this section, building perimeter shall be measured at that story having the maximum enclosed floor area ...
NYC 1968 Code (Vol I) > 4 Building Limitations > 2 Building Access > §27-291 Frontage
506.2 General Building Heights and Areas; Separation of Occupancies, Frontage Increase
Where a building has more than 25 percent of its perimeter adjoining a public way or open space having a minimum width of 20 feet (6096 mm ...
NYC Building Code 2014 > 5 General Building Heights and Areas; Separation of Occupancies > 506 Building Area Modifications > 506.2 Frontage Increase
506.2 General Building Heights and Areas; Separation of Occupancies, Frontage Increase
: I f = Area increase factor due to frontage. F = Building perimeter that fronts on a public way or open space ...
NYC Building Code 2008 > 5 General Building Heights and Areas; Separation of Occupancies > 506 Area Modifications > 506.2 Frontage Increase
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE