// CODE SNIPPET
§28-314.2 Frequency of Inspection and Testing
JUMP TO FULL CODE CHAPTER
The owner shall test and inspect wastewater recycling systems on a monthly basis. The commissioner may require additional testing and inspections of wastewater recycling systems as necessary to protect public safety.
Related Code Sections
§28-304.5 Maintenance of Buildings, Frequency of Inspection and Testing
Elevators and other conveying systems may be subject to more frequent inspection and testing as the commissioner finds necessary to protect public ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 304 Elevators and Conveying Systems > §28-304.5 Frequency of Inspection and Testing
§28-304.5 Maintenance of Buildings, Frequency of Inspection and Testing
Elevators and other conveying systems may be subject to more frequent inspection and testing as the commissioner finds necessary to protect public ...
NYC General Admin. Provisions 2008 > 3 Maintenance of Buildings > 304 Periodic Inspection of Elevators > §28-304.5 Frequency of Inspection and Testing
§28-314.2 Maintenance of Buildings, Frequency of Inspection and Testing
The owner shall test and inspect wastewater recycling systems on a monthly basis. The commissioner may require additional testing and inspections ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 314 Periodic Wastewater Recycling System Inspection and Testing > §28-314.2 Frequency of Inspection and Testing
*§28-318.2 Maintenance of Buildings, Frequency of Inspection
, with a frequency other than five years, the commissioner may, by rule, require that the periodic inspections required by this article be conducted ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 318 Periodic Inspection of Gas Piping Systems > *§28-318.2 Frequency of Inspection
1905.6.2 Concrete, Frequency of Testing
The frequency of conducting strength tests of concrete shall be as specified in Sections 1905.6.2.1 through 1905.6.2.4 ...
NYC Building Code 2008 > 19 Concrete > 1905 Concrete Quality, Mixing and Placing > 1905.6 Evaluation and Acceptance of Concrete > 1905.6.2 Frequency of Testing