UpCodes logo
// CODE SNIPPET

§27-612 Formwork, Slip Form Construction, Lift Method Construction, Precast and Prestressed Construction

Go To Full Code Chapter
The provisions of subchapter nineteen of this chapter shall apply.

Related Code Sections

3305.3 Safeguards During Construction or Demolition, Concrete Formwork
construction documents and form design drawings are provided, that the formwork conforms to the construction documents and form design drawings ...
26.11 Construction Documents and Inspection, Formwork
Compliance requirements: (a) Design of formwork shall consider (1) through (5): (1) Method of concrete placement. (2 ...
1906.6.7 Concrete, Prestressed Construction
Solid safety shields shall be provided at end anchorages of prestressing beds, or where necessary, for protection against breakage of prestressing ...
3305.3 Safeguards During Construction or Demolition, Concrete Formwork
Forms for prestressed and post-tensioned concrete members shall be designed and constructed to permit movement of the member without damage during ...