Section 1906 Formwork, Embedded Pipes and Construction Joints
JUMP TO FULL CODE CHAPTER
The design, fabrication and erection of forms shall comply with ACI 318, Section 6.1.
The removal of forms and shores, including from slabs and beams (except where cast on the ground), and the installation of reshores shall comply with ACI 318, Section 6.2.
Conduits, pipes and sleeves of any material not harmful to concrete and within the limitations of ACI 318, Section 6.3, are permitted to be embedded in concrete with approval of the registered design professional.
Related Code Sections
Section 1906 Concrete, Formwork, Embedded Pipes and Construction Joints
Construction joints, including their location, shall comply with the provisions of ACI 318, Section 6.4 ...
26.11 Construction Documents and Inspection, Formwork
of the members as required by the construction documents. (c) Formwork shall be sufficiently tight to inhibit leakage of paste or mortar. (d) Formwork ...
Building Code Requirements for Structural Concrete of Alabama > 26 Construction Documents and Inspection > 26.11 Formwork
26.11 Construction Documents and Inspection, Formwork
be placed on, nor any formwork removed from, any part of the structure under construction except when that portion of the structure in combination ...
Building Code Requirements for Structural Concrete of Alabama > 26 Construction Documents and Inspection > 26.11 Formwork
1209.3 Hydronic Piping, Embedded Joints
Joints of pipe or tubing that are embedded in a portion of the building, such as concrete or plaster, shall be in accordance with the requirements ...
Mechanical Code 2021 of Alabama > 12 Hydronic Piping > 1209 Embedded Piping > 1209.3 Embedded Joints
1209.3 Hydronic Piping, Embedded Joints
Joints of pipe or tubing that are embedded in a portion of the building, such as concrete or plaster, shall be in accordance with the requirements ...
Mechanical Code 2009 of Alabama > 12 Hydronic Piping > 1209 Embedded Piping > 1209.3 Embedded Joints