// CODE SNIPPET
P3009.13 Flushing Water Systems
JUMP TO FULL CODE CHAPTER
Systems for flushing water closets and urinals shall comply with Sections P3009.13.1 through P3009.13.6.
The holding capacity of the reservoir shall be a minimum of twice the volume of water required to meet the daily flushing requirements of the fixtures supplied with gray water, but not less than 50 gallons (189 L). The reservoir shall be sized to limit the retention time of gray water to a maximum of 72 hours.
Gray water shall be disinfected by an approved method that employs one or more disinfectants such as chlorine, iodine or ozone that are recommended for use with the pipes, fittings and equipment by the manufacturer of the pipes, fittings and equipment.
Potable water shall be supplied as a source of makeup water for the gray water system. The potable water supply shall be protected against backflow in accordance with Section P2902. There shall be a full-open valve located on the makeup water supply line to the collection reservoir.
The gray water shall be dyed blue or green with a food-grade vegetable dye before such water is supplied to the fixtures.
Distribution piping shall conform to one of the standards listed in Table P2905.4.
Distribution piping and reservoirs shall be identified as containing nonpotable water. Piping identification shall be in accordance with Section P2901.1.
Related Code Sections
P3009.13 Sanitary Drainage, Flushing Water Systems
Systems for flushing water closets and urinals shall comply with Sections P3009.13.1 through P3009.13.6 ...
2014 FBC - Residential, 5th edition > 30 Sanitary Drainage > P3009 Gray Water Recycling Systems > P3009.13 Flushing Water Systems
P3009.13.6 Sanitary Drainage, Identification
Distribution piping and reservoirs shall be identified as containing nonpotable water. Piping identification shall be in accordance with Section ...
2014 FBC - Residential, 5th edition > 30 Sanitary Drainage > P3009 Gray Water Recycling Systems > P3009.13 Flushing Water Systems > P3009.13.6 Identification
1301.1 Gray Water Recycling Systems, Scope
The provisions of Chapter 13 shall govern the materials, design, construction and installation of gray water systems for flushing of water closets ...
P3009.1 Sanitary Drainage, Scope
The provisions of Section P3009 shall govern the materials, design, construction and installation of gray water systems for flushing of water closets ...
2014 FBC - Residential, 5th edition > 30 Sanitary Drainage > P3009 Gray Water Recycling Systems > P3009.1 Scope
1302.3 Gray Water Recycling Systems, Makeup Water
Potable water shall be supplied as a source of makeup water for the gray water system. The potable water supply shall be protected against backflow ...
2014 FBC - Plumbing, 5th edition > 13 Gray Water Recycling Systems > 1302 Systems for Flushing Water Closets and Urinals > 1302.3 Makeup Water