• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§28-116.2.4.1 Final Inspection Prior to Certificate of Occupancy

NYC General Admin. Provisions 2014 > 1 Administration > 116 Inspections and Sign-Off of Completed Work > §28-116.2 Types of Inspections > *§28-116.2.4 Final Inspection > §28-116.2.4.1 Final Inspection Prior to Certificate of Occupancy
JUMP TO FULL CODE CHAPTER
In all cases where the permitted work requires the issuance of a new or amended certificate of occupancy, the final inspection shall be performed by the department in the presence of the permit holder, the registered design professional of record or the superintendent of construction. Such inspection shall be performed after all work authorized by the building permit is completed and before the issuance of the certificate of occu-pancy. All failures to comply with the provisions of this code or approved construction documents shall be noted and the owner promptly notified thereof in writing. All defects noted in such inspection shall be corrected. Reports of such final inspections shall be maintained by the department. The final inspection report shall confirm that defects noted have been corrected, that the work is in substantial compliance with the approved construction documents and with this code and with other applicable laws and rules and that all required inspections were performed.
Exception: For amended certificates of occupancy subject to section 28-118.16.2, the term construction documents, as used in section 28-116.2.4.1, shall consist of an accurate and complete final lot survey made by a land surveyor, and floor and roof plans showing, at a minimum, compliance with exit requirements in accordance with this code.

Related Code Sections


§28-116.2.4.1 Administration, Final Inspection Prior to Certificate of Occupancy
In all cases where the permitted work requires the issuance of a new or amended certificate of occupancy, the final inspection shall be performed ...
NYC General Admin. Provisions 2014 > 1 Administration > 116 Inspections and Sign-Off of Completed Work > §28-116.2 Types of Inspections > *§28-116.2.4 Final Inspection > §28-116.2.4.1 Final Inspection Prior to Certificate of Occupancy
§28-116.2.4.1 Administration, Final Inspection Prior to Certificate of Occupancy
In all cases where the permitted work requires the issuance of a new or amended certificate of occupancy, the final inspection shall be performed ...
NYC General Admin. Provisions 2022 > 1 Administration > 116 Inspections and Sign-Off of Completed Work > §28-116.2 Types of Inspections > *§28-116.2.4 Final Inspection > §28-116.2.4.1 Final Inspection Prior to Certificate of Occupancy
§28-116.2.4.1 Administration, Final Inspection Prior to Certificate of Occupancy
In all cases where the permitted work requires the issuance of a new or amended certificate of occupancy, the final inspection shall be performed ...
NYC General Admin. Provisions 2008 > 1 Administration > 116 Inspections and Sign-Off of Completed Work > §28-116.2 Types of Inspections > §28-116.2.4 Final Inspection > §28-116.2.4.1 Final Inspection Prior to Certificate of Occupancy
§28-118.4.3 Administration, Timeframe for Application
to issue a certificate of occupancy where the final inspection was completed more than six months prior to such application ...
NYC General Admin. Provisions 2022 > 1 Administration > 118 Certificates of Occupancy > §28-118.4 Applications for Certificates of Occupancy > §28-118.4.3 Timeframe for Application
§28-116.2.4.2 Administration, Final Inspection Prior to Letter of Completion
In all cases where the permitted work does not require the issuance of a certificate of occupancy, the final inspection shall be performed ...
NYC General Admin. Provisions 2008 > 1 Administration > 116 Inspections and Sign-Off of Completed Work > §28-116.2 Types of Inspections > §28-116.2.4 Final Inspection > §28-116.2.4.2 Final Inspection Prior to Letter of Completion
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING