• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.66(e)(9) Fail-Safe Controls

OSHA 1926 Construction > D Occupational Health and Environmental Controls > 1926.66 Criteria for Design and Construction of Spray Booths > 1926.66(e) Fixed Electrostatic Apparatus > 1926.66(e)(9) Fail-Safe Controls
JUMP TO FULL CODE CHAPTER
Electrostatic apparatus shall be equipped with automatic controls which will operate without time delay to disconnect the power supply to the high voltage transformer and to signal the operator under any of the following conditions:

1926.66(e)(9)(i)

Stoppage of ventilating fans or failure of ventilating equipment from any cause.

1926.66(e)(9)(iii)

Occurrence of a ground or of an imminent ground at any point on the high voltage system.

1926.66(e)(9)(iv)

Reduction of clearance below that specified in paragraph (e)(6) of this section.

1926.66(e)(9)(ii)

Stoppage of the conveyor carrying goods through the high voltage field.

Related Code Sections


1926.66(e)(9) Occupational Health and Environmental Controls, Fail-Safe Controls
Electrostatic apparatus shall be equipped with automatic controls which will operate without time delay to disconnect the power supply to the high ...
OSHA 1926 Construction > D Occupational Health and Environmental Controls > 1926.66 Criteria for Design and Construction of Spray Booths > 1926.66(e) Fixed Electrostatic Apparatus > 1926.66(e)(9) Fail-Safe Controls
1926.1436(j) Cranes & Derricks in Construction, Power Failure Procedures
If power fails during operations, the derrick operator must safely stop operations. This must include ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1436 Derricks > 1926.1436(j) Power Failure Procedures
1926.406(a)(2) Electrical, Control
A limit switch or other device shall be provided to prevent the load block from passing the safe upper limit of travel of any hoisting mechanism ...
OSHA 1926 Construction > K Electrical > 1926.406 Specific Purpose Equipment and Installations > 1926.406(a) Cranes and Hoists > 1926.406(a)(2) Control
1926.702(e)(2) Concrete and Masonry Construction,
Compressed air hoses used on concrete pumping system shall be provided with positive fail-safe joint connectors to prevent separation of sections ...
OSHA 1926 Construction > Q Concrete and Masonry Construction > 1926.702 Requirements for Equipment and Tools > 1926.702(e) Concrete Pumping Systems > 1926.702(e)(2)
1926.702(e) Concrete and Masonry Construction, Concrete Pumping Systems
with positive fail-safe joint connectors to prevent separation of sections when pressurized ...
OSHA 1926 Construction > Q Concrete and Masonry Construction > 1926.702 Requirements for Equipment and Tools > 1926.702(e) Concrete Pumping Systems
Help Contact Us Privacy Terms
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE