• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§27-2103 Extension of Time for Registration

§27 ‒ Housing Maintenance Code > 4 Administration > 2 Registration > §27-2103 Extension of Time for Registration
JUMP TO FULL CODE CHAPTER
In any case where the owner or other person required to file is unable to comply with the registration requirements within the applicable time period specified in this article, the department may, upon good cause shown, extend the registration period and waive the penalties for failure to register set forth in section 27-2107 of this article during such period.

Related Code Sections


*§28-317.3 Maintenance of Buildings, Registration
All owners of cooling towers shall register such towers with the department prior to initial operation in a form and manner as required ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > *317 Cooling Towers > *§28-317.3 Registration
2702.1.6 Electrical, Registration
Fuel-burning equipment for an emergency or standby power system shall be registered with the Department of Environmental Protection in accordance ...
NYC Building Code 2014 > 27 Electrical > 2702 Emergency and Standby Power Systems > 2702.1 Installation > 2702.1.6 Registration
§27-396.5 Means of Egress, Registration
Emergency power generation equipment shall be registered with the department of environmental protection, bureau of air resources in accordance ...
NYC 1968 Code (Vol I) > 6 Means of Egress > 11 Emergency Power > §27-396.5 Registration
1618.1.1.1 Structural Design, Extension of Time
Subject to the approval of the commissioner, a request to extend the time for a temporary installation, subject to the limits in Section 1618.1.1 ...
NYC Building Code 2014 > 16 Structural Design > 1618 Loads on Temporary Installations > 1618.1 General > 1618.1.1 Duration > 1618.1.1.1 Extension of Time
§28-305.4.7.4 Maintenance of Buildings, Extension
The commissioner may grant an extension of time of up to 90 days from the date of the application for an extension to complete the repairs required ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 305 Retaining Walls, Partition Fences and Other Site Structures > §28-305.4 Maintenance, Inspection and Repair of Retaining Walls > §28-305.4.7 Repair of Unsafe Condition > §28-305.4.7.4 Extension
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE