J106.1 Maximum Slope
The slope of cut surfaces shall be not steeper than is safe for the intended use, and shall be not more than one unit vertical in two units horizontal (50-percent slope) unless the owner or the owner's authorized agent furnishes a geotechnical report justifying a steeper slope.
Upcodes Diagrams
Related Code Sections
1203.2 Fuel Gas Piping, Excavation
Excavations required for the installation of underground piping shall be kept open until the piping
has been inspected and approved. Where ...
1203.2 Fuel Gas Piping, Excavation
Excavations required for the installation
of underground piping shall be kept open until such time as
the piping has been inspected and approved ...
1203.2 Fuel Gas Piping, Excavation
Excavations required for the installation of underground piping shall be kept open until the piping
has been inspected and approved. Where ...
1303.2 Fuel Gas Piping, Excavation
Excavations required for the installation
of underground piping shall be kept open until such time as
the piping has been inspected and approved ...
1303.2 Fuel Gas Piping, Excavation
Excavations required for the installation
of underground piping shall be kept open until such time
as the piping has been inspected and approved ...