// CODE SNIPPET
§1-08.4 Examiners' Review
JUMP TO FULL CODE CHAPTER
After the applicant files the application on the appropriate calendar, the Board will review the application and will notify the applicant, in writing, whether the application is complete or whether additional information is required. The Board may require additional information from the applicant that it deems necessary to determine whether or not the action will have a significant effect on the environment.
Related Code Sections
G311.2.3 Flood-Resistant Construction, Filing
The department may promulgate rules establishing filing fees for the review and examination of such reports ...
NYC Building Code 2014 > G Flood-Resistant Construction > G311 Retroactive Requirements > G311.2 Connections for Temporary External Generators > G311.2.3 Filing
§28-302.2 Maintenance of Buildings, Inspection Requirements
include a complete review of the most recently prepared report and an inspection. Such examination shall be conducted in accordance with rules ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 302 Maintenance of Exterior Walls > §28-302.2 Inspection Requirements
§28-302.2 Maintenance of Buildings, Inspection Requirements
2. Such examination shall include a complete review of the most recently prepared report and an inspection. 3. Such examination shall ...
NYC General Admin. Provisions 2008 > 3 Maintenance of Buildings > 302 Maintenance of Exterior Walls > §28-302.2 Inspection Requirements
1814.1 Soils and Foundations, General
of the structure as determined from examination of the structure, the review of available design documents and if necessary, the excavation of test ...
Section 1814 Soils and Foundations, Underpinning
of the structure as determined from examination of the structure, the review of available design documents and if necessary, the excavation of test ...