• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

503.12.1 Equipment Requiring Draft Hoods

NYC Fuel Gas Code 2008 > 5 Chimneys and Vents > 503 Venting of Equipment > 503.12 Draft Hoods and Draft Controls > 503.12.1 Equipment Requiring Draft Hoods
JUMP TO FULL CODE CHAPTER
Vented equipment shall be installed with draft hoods.
  Exception: Incinerators, direct-vent equipment, fan-assisted combustion system appliances, equipment requiring chimney draft for operation, equipment equipped with blast, power, or pressure burners that are not listed for use with draft hoods, and equipment designed for forced venting.

Related Code Sections


503.12.1 Chimneys and Vents, Equipment Requiring Draft Hoods
Vented equipment shall be installed with draft hoods.    Exception: Incinerators, direct-vent equipment, fan-assisted combustion system ...
NYC Fuel Gas Code 2008 > 5 Chimneys and Vents > 503 Venting of Equipment > 503.12 Draft Hoods and Draft Controls > 503.12.1 Equipment Requiring Draft Hoods
§27-881 Chimneys and Gas Vents, Draft Hoods
equipment shall be installed in accordance with the requirements of the applicable standard in reference standard 15-2. The draft hood shall be located ...
NYC 1968 Code (Vol I) > 15 Chimneys and Gas Vents > 5 Gas Vent Systems > §27-881 Draft Hoods
503.12.1 Chimneys and Vents, Appliances Requiring Draft Hoods
appliances, appliances requiring chimney draft for operation, appliances equipped with blast, power, or pressure burners that are not listed for use ...
NYC Fuel Gas Code 2014 > 5 Chimneys and Vents > 503 Venting of Appliances > 503.12 Draft Hoods and Draft Controls > 503.12.1 Appliances Requiring Draft Hoods
503.15 Chimneys and Vents, Obstructions
of appliances not required to be equipped with draft hoods, provided that the appliance manufacturer's instructions cover the installation ...
NYC Fuel Gas Code 2014 > 5 Chimneys and Vents > 503 Venting of Appliances > 503.15 Obstructions
503.12.2 Chimneys and Vents, Installation
by the appliance manufacturer. Draft hoods shall be equipped with a thermal safety (spill) switch installed in accordance with its listing ...
NYC Fuel Gas Code 2014 > 5 Chimneys and Vents > 503 Venting of Appliances > 503.12 Draft Hoods and Draft Controls > 503.12.2 Installation
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE