// CODE SNIPPET
312.1.2 Equipment, Material, Power and Labor for Tests
JUMP TO FULL CODE CHAPTER
Equipment, material, power and labor necessary for testing a plumbing system or part thereof shall be furnished by the owner or the owner's representative. Required tests shall be conducted by and at the expense of the owner or the owner's representative.
Related Code Sections
312.1.2 General Regulations, Equipment, Material, Power and Labor for Tests
Equipment, material, power and labor necessary for testing a plumbing system or part thereof shall be furnished by the owner or the owner's ...
Ohio Plumbing Code 2011 > 3 General Regulations > 312 Tests and Inspections > 312.1 Required Tests > 312.1.2 Equipment, Material, Power and Labor for Tests
108.8.2 Scope and Administration, Apparatus, Material and Labor for Tests
Apparatus, material and labor required for testing a system or part thereof shall be furnished by the owner or the owner's representative. Required ...
Ohio Mechanical Code 2011 > 1 Scope and Administration > 108 Inspection Process > 108.8 Testing of Building Service Equipment > 108.8.2 Apparatus, Material and Labor for Tests
108.8.2 Scope and Administration, Apparatus, Material and Labor for Tests
Apparatus, material and labor required for testing a system or part thereof shall be furnished by the owner or the owner's representative. Required ...
Ohio Plumbing Code 2011 > 1 Scope and Administration > 108 Inspection Process > 108.8 Testing of Building Service Equipment > 108.8.2 Apparatus, Material and Labor for Tests
108.8.2 Administration, Apparatus, Material and Labor for Tests
Apparatus, material and labor required for testing a system or part thereof shall be furnished by the owner or the owner's representative. Required ...
Ohio Residential Code 2013 > 1 Administration > 108 Inspection Process > 108.8 Testing of Residential Building Service Equipment > 108.8.2 Apparatus, Material and Labor for Tests
Section 312 General Regulations, Tests and Inspections
of this code. The permit holder shall give reasonable advance notice to the code official when the plumbing work is ready for tests. The equipment, material ...