// CODE SNIPPET
101.5.3.2 Energy Analysis
JUMP TO FULL CODE CHAPTER
For any application that is not exempt from this code and for which a work permit is required in accordance with Section 28-105 of the Administrative Code, an energy analysis shall be provided on a sheet or sheets within the construction drawing set. The energy analysis shall identify the compliance path followed, demonstrate how the design complies with this code and be in a format as prescribed in the rules of the department. The energy analysis shall meet the requirements of this code for the entire project. Projects that utilize trade-offs among disciplines shall use DOE2-based energy modeling programs or other energy-modeling programs as prescribed in the rules of the department and shall be signed and sealed by a lead energy professional.
Related Code Sections
*§28-104.7.9 Administration, Energy Conservation Code
shall include signed and sealed construction drawings to the extent that they demonstrate such energy code compliance in the energy analysis ...
NYC General Admin. Provisions 2008 > 1 Administration > 104 Construction Documents > §28-104.7 Submittal of Construction Documents > *§28-104.7.9 Energy Conservation Code
1626.9.3 Structural Design, Energy Methods
Static inelastic analysis using energy equilibrium may also be used. The structure does not need to remain elastic; however, the response ratio ...
NYC Building Code 2008 > 16 Structural Design > 1626 Structural Integrity—Key Element Analysis > 1626.9 Analysis Procedures > 1626.9.3 Energy Methods
107.6 Administration, Architectural Plans
for the envelope in the energy analysis submitted as part of the initial filing is not exceeded ...
106.6 Administration, Architectural Plans
for the envelope in the energy analysis submitted as part of the initial filing is not exceeded. *Section BC 106.6 was amended by: Local Law 85 of 2009 . This ...
§28-308.7.1.1 Maintenance of Buildings, Early Compliance Audit Completed After January 1, 2006 and Prior to the Effective Date of This Article
criteria: The audit shall have met the requirements of the Level II Energy Survey and Analysis of the 2004 edition of Procedures for Commercial ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 308 Energy Audits and Retro-Commissioning of Base Building Systems > §28-308.7 Early Compliance > §28-308.7.1 Early Compliance Energy Audit Report > §28-308.7.1.1 Early Compliance Audit Completed After January 1, 2006 and Prior to the Effective Date of This Article