• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§12-01 Emergency Power System Requirements. [Repealed]

Title 1 ‒ Department of Buildings > 12 Emergency Power Systems > §12-01 Emergency Power System Requirements. [Repealed]
JUMP TO FULL CODE CHAPTER
tppn
Linked Resources Available

This section has been clarified by a tppn issued by the Department of Buildings.

Learn more in the Linked Resources panel on the right.

Related Code Sections


Appendix A Selected Rules of the Department of Buildings [PDF] (page 2)
Code, Renewal of Temporary Use Permits and Fees Ch.12 Emergency Power Systems §12-01 Emergency Power System Requirements Ch. 13 Adjudications ...
NYC 1968 Code (Vol II) [PDF] > A Selected Rules of the Department of Buildings
§28-113.3.7 Administration, Amendment and Repeal
The commissioner shall have the power to amend or repeal the approval of any material, including materials previously approved by the board ...
NYC General Admin. Provisions 2014 > 1 Administration > 113 Materials > §28-113.3 Approval Procedure > §28-113.3.7 Amendment and Repeal
§28-113.3.7 Administration, Amendment and Repeal
The commissioner shall have the power to amend or repeal the approval of any material, including materials previously approved by the board ...
NYC General Admin. Provisions 2008 > 1 Administration > 113 Materials > §28-113.3 Approval Procedure > §28-113.3.7 Amendment and Repeal
Appendix A Selected Rules of the Department of Buildings [PDF] (page 33)
Rules and Regulations requirements of §24-109 of the Administrative Code. (m) Inspection and test. Generator sets serving Emergency Power Systems ...
NYC 1968 Code (Vol II) [PDF] > A Selected Rules of the Department of Buildings
405.9 Special Detailed Requirements Based on Use and Occupancy, Emergency Power
An emergency power system complying with Section 2702 shall be provided for emergency power loads specified in Section 405.9.1 ...
NYC Building Code 2014 > 4 Special Detailed Requirements Based on Use and Occupancy > 405 Underground Buildings and Spaces > 405.9 Emergency Power
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE