• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

A-903.2 Electrical Permit Fees

Philadelphia Administrative Code > 9 Fees > A-903 Electrical Code Fees > A-903.2 Electrical Permit Fees
JUMP TO FULL CODE CHAPTER
The permit fee for electrical work shall be $25 for each $1,000 or fraction thereof of estimated electrical construction costs. The minimum fee shall be $50. The maximum fee shall be $15,000. Except as provided in Section A-903.2.1, the construction costs shall be determined by inclusion of the following:
  1. All electrical equipment, conductors, conduit, etc.,
  2. All material,
  3. All labor,
  4. Overhead and profit.

UpCodes note: Section A-903.2 was amended by Bill No. 110533 which was approved on November 14, 2011.

A-903.2.1 Calculation of Construction Costs for Solar Electric (Also Known as Photovoltaic) Systems

A-903.2.1.1 Solar Electric System or Photovoltaic System Defined

For the purposes of this subsection, the terms "solar electric system" and "photovoltaic system" shall each mean the total components and subsystems that, in combination, convert solar energy into electrical energy suitable for connection to a utilization load.

A-903.2.1.2

For the purpose of calculating the electrical permit fee, the electrical construction costs for any project that includes installation of a solar electric or photovoltaic system shall not include the cost of any arrays or inverters used in the installation of such systems.

Related Code Sections


A-903.2 Fees, Electrical Permit Fees
The permit fee for electrical work shall be $25 for each $1,000 or fraction thereof of estimated electrical construction costs. The minimum fee shall ...
Philadelphia Administrative Code > 9 Fees > A-903 Electrical Code Fees > A-903.2 Electrical Permit Fees
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE