• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

R309.8 Electric Vehicle (EV) Charging Infrastructure

California Residential Code 2016 > 3 Building Planning > R309 Garages and Carports > R309.8 Electric Vehicle (EV) Charging Infrastructure
JUMP TO FULL CODE CHAPTER
Newly constructed one- and two-family dwellings and town-houses with attached private garages shall comply with EV infrastructure requirements in accordance with the California Green Building Standards Code, Chapter 4, Division 4.1.

Related Code Sections


R309.8 Building Planning, Electric Vehicle (EV) Charging Infrastructure
Newly constructed one- and two-family dwellings and town-houses with attached private garages shall comply with EV infrastructure requirements ...
California Residential Code 2016 > 3 Building Planning > R309 Garages and Carports > R309.8 Electric Vehicle (EV) Charging Infrastructure
R309.8 Building Planning, Electric Vehicle (EV) Charging Infrastructure
Newly constructed one- and two-family dwellings and townhouses with attached private garages shall comply with EV infrastructure requirements ...
California Residential Code 2019 > 3 Building Planning > R309 Garages and Carports > R309.8 Electric Vehicle (EV) Charging Infrastructure
5.106.5.3 Nonresidential Mandatory Measures, Electric Vehicle (EV) Charging
installation of EVSE. Exceptions: On a case-by-case basis where the local enforcing agency has determined EV charging and infrastructure ...
California Green Building Standards Code 2016 > 5 Nonresidential Mandatory Measures > 5.106 Site Development > 5.106.4 Bicycle Parking > 5.106.5.3 Electric Vehicle (EV) Charging
5.106.5.3 Nonresidential Mandatory Measures, Electric Vehicle (EV) Charging [N]
of EVSE. Exceptions: On a case-by-case basis where the local enforcing agency has determined EV charging and infrastructure is not feasible based ...
California Green Building Standards Code 2019 > 5 Nonresidential Mandatory Measures > 5.106 Site Development > 5.106.5 > 5.106.5.3 Electric Vehicle (EV) Charging [N]
4.106.4 Residential Mandatory Measures, Electric Vehicle (EV) Charging for New Construction
types of parking facilities, shall be electric vehicle charging spaces (EV spaces) capable of supporting future EVSE. Calculations for the required ...
California Green Building Standards Code 2019 > 4 Residential Mandatory Measures > 4.106 Site Development > 4.106.4 Electric Vehicle (EV) Charging for New Construction
Help Contact Us Privacy Terms
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING