// CODE SNIPPET
P3007.3.5 Ejector Connection to the Drainage System
Go To Full Code Chapter
Pumps connected to the drainage system shall connect to a building sewer, building drain, soil stack, waste stack or horizontal branch drain. Where the discharge line connects into horizontal drainage piping, the connection shall be made through a wye fitting into the top of the drainage piping and such wye fitting shall be located not less than 10 pipe diameters from the base of any soil stack, waste stack or fixture drain.
Upcodes Diagrams
Related Code Sections
P3007.3.5 Sanitary Drainage, Ejector Connection to the Drainage System
Pumps connected to the drainage system shall connect to a building sewer, building drain, soil stack, waste stack or horizontal branch drain. Where ...
P3007.3.5 Sanitary Drainage, Ejector Connection to the Drainage System
Pumps connected to the drainage system shall connect to a building sewer, building drain,soil stack, waste stack or horizontal branch drain.Where ...
Section 712 Sanitary Drainage, Sumps and Ejectors
connected to the drainage system shall connect to a building sewer, building drain, soil stack, waste stack or horizontal branch drain. Where ...
P3007.3 Sanitary Drainage, Sump Design
Pumps connected to the drainage system shall connect to a building sewer, building drain,soil stack, waste stack or horizontal branch drain.Where ...
P3007.5 Sanitary Drainage, Macerating Toilet Systems and Pumped Waste Systems
Macerating toilet systems and pumped waste systems shall comply with ASME A112.3.4/CSA B45.9 and shall be installed in accordance ...