• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§28-104.2.10.1 Effect on Work Permit

NYC General Admin. Provisions 2022 > 1 Administration > 104 Construction Documents > *§28-104.2 Application for Approval of Construction Documents > §28-104.2.10 Revocation of Approval > §28-104.2.10.1 Effect on Work Permit
JUMP TO FULL CODE CHAPTER
The effect of revocation of approval of construction documents is the automatic revocation of all work permits that may have been issuedbased on such construction documents.

Related Code Sections


§28-104.2.10.1 Administration, Effect on Work Permit
The effect of revocation of approval of construction documents is the automatic revocation of all work permits that may have been issuedbased ...
NYC General Admin. Provisions 2014 > 1 Administration > 104 Construction Documents > *§28-104.2 Application for Approval of Construction Documents > §28-104.2.10 Revocation of Approval > §28-104.2.10.1 Effect on Work Permit
§28-104.2.10.1 Administration, Effect on Work Permit
The effect of revocation of approval of construction documents is the automatic revocation of all work permits that may have been issuedbased ...
NYC General Admin. Provisions 2022 > 1 Administration > 104 Construction Documents > *§28-104.2 Application for Approval of Construction Documents > §28-104.2.10 Revocation of Approval > §28-104.2.10.1 Effect on Work Permit
§28-104.2.10.1 Administration, Effect on Work Permit
The effect of revocation of approval of construction documents is the automatic revocation of all associated work permits that may have been issued ...
NYC General Admin. Provisions 2008 > 1 Administration > 104 Construction Documents > §28-104.2 Application for Approval of Construction Documents > §28-104.2.10 Revocation of Approval > §28-104.2.10.1 Effect on Work Permit
§28-101.4.1 Administration, Permit Issued or Work Commenced Prior to Effective Date
If a permit for work was issued prior to the effective date of this code or, if no permit was necessary, work was commenced prior to such effective ...
NYC General Admin. Provisions 2008 > 1 Administration > 101 General > §28-101.4 Effective Date > §28-101.4.1 Permit Issued or Work Commenced Prior to Effective Date
Article 213 Enforcement, Penalty for Work Without a Permit
Exception: No such penalty shall be imposed for work performed without a permit to hang or attach upon or on the outside of any building a sign ...
NYC General Admin. Provisions 2014 > 2 Enforcement > 213 Penalty for Work Without a Permit
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING