1704.7.2 During Fill Placement
JUMP TO FULL CODE CHAPTER
During placement and compaction of the fill material, the special inspector shall determine that the material being used and the maximum lift thickness comply with the approved geotechnical report, as specified in Section 1803.5.
Related Code Sections
1704.7.2 Structural Tests and Special Inspections, During Fill Placement
During placement and compaction of the fill material, the special inspector shall determine that the material being used and the maximum lift ...
NYC Building Code 2008 > 17 Structural Tests and Special Inspections > 1704 Special Inspections > 1704.7 Soils > 1704.7.2 During Fill Placement
1704.7.2 Structural Tests and Special Inspections, During Fill Placement
During placement and compaction of the fill material, the special inspector shall determine that the material being used and the maximum lift ...
NYC Building Code 2014 > 17 Structural Tests and Special Inspections > 1704 Special Inspections > 1704.7 Subsurface Conditions > 1704.7.2 During Fill Placement
3314.7.2 Safeguards During Construction or Demolition, Placement
Outrigger beams shall be placed so that the suspension ropes will hang vertically ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.7 Outrigger Beams > 3314.7.2 Placement
1803.2 Soils and Foundations, Placement of Backfill
The excavation outside the foundation shall be backfilled with soil that is free of organic material, construction debris, cobbles and boulders ...
NYC Building Code 2008 > 18 Soils and Foundations > 1803 Excavation, Grading and Fill > 1803.2 Placement of Backfill
1803.2 Soils and Foundations, Placement of Backfill
The excavation outside the foundation shall be backfilled with soil that is free of organic material, construction debris, or boulders. A controlled ...
NYC Building Code 2014 > 18 Soils and Foundations > 1803 Excavation, Grading and Fill > 1803.2 Placement of Backfill