• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1704.7.2 During Fill Placement

NYC Building Code 2014 > 17 Structural Tests and Special Inspections > 1704 Special Inspections > 1704.7 Subsurface Conditions > 1704.7.2 During Fill Placement
JUMP TO FULL CODE CHAPTER
During placement and compaction of the fill material, the special inspector shall determine that the material being used and the maximum lift thickness comply with the approved geotechnical report, as specified in Section 1803.5.

Related Code Sections


1704.7.2 Structural Tests and Special Inspections, During Fill Placement
During placement and compaction of the fill material, the special inspector shall determine that the material being used and the maximum lift ...
NYC Building Code 2008 > 17 Structural Tests and Special Inspections > 1704 Special Inspections > 1704.7 Soils > 1704.7.2 During Fill Placement
1704.7.2 Structural Tests and Special Inspections, During Fill Placement
During placement and compaction of the fill material, the special inspector shall determine that the material being used and the maximum lift ...
NYC Building Code 2014 > 17 Structural Tests and Special Inspections > 1704 Special Inspections > 1704.7 Subsurface Conditions > 1704.7.2 During Fill Placement
3314.7.2 Safeguards During Construction or Demolition, Placement
Outrigger beams shall be placed so that the suspension ropes will hang vertically ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.7 Outrigger Beams > 3314.7.2 Placement
1803.2 Soils and Foundations, Placement of Backfill
The excavation outside the foundation shall be backfilled with soil that is free of organic material, construction debris, cobbles and boulders ...
NYC Building Code 2008 > 18 Soils and Foundations > 1803 Excavation, Grading and Fill > 1803.2 Placement of Backfill
1803.2 Soils and Foundations, Placement of Backfill
The excavation outside the foundation shall be backfilled with soil that is free of organic material, construction debris, or boulders. A controlled ...
NYC Building Code 2014 > 18 Soils and Foundations > 1803 Excavation, Grading and Fill > 1803.2 Placement of Backfill
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE