• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

*§28-308.4.1 Due Dates

NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 308 Energy Audits and Retro-Commissioning of Base Building Systems > §28-308.4 Energy Efficiency Report Required > *§28-308.4.1 Due Dates
JUMP TO FULL CODE CHAPTER
The first energy efficiency reports for covered buildings in existence on the effective date of this article and for new buildings shall be due, beginning with calendar year 2013, in the calendar year with a final digit that is the same as the last digit of the building's tax block number, as illustrated in the following chart:

Last
digit of
tax block
number
0 1 2 3 4 5 6 7 8 9
Year first
EER is
due
2020 2021 2022 2013 2014 2015 2016 2017 2018 2019


Owners of covered buildings (i) that are less than 10 years old at the commencement of their first assigned calendar year or (ii) that have undergone substantial rehabilitation, as certified by a registered design professional, within the 10 year period prior to any calendar year in which an energy efficiency report is due, such that at the commencement of such calendar year all of the base building systems of such building are in compliance with the New York city energy conservation code as in effect for new buildings constructed on and after July 1, 2010, or as in effect on the date of such substantial rehabilitation, whichever is later, may defer submitting an energy efficiency report for such building until the tenth calendar year after such assigned calendar year.

Exceptions:
  1. The first due dates for city buildings shall be in accordance with a staggered schedule, commencing with calendar year 2013 and ending with calendar year 2022 for buildings in existence on the effective date of this article, to be submitted by the department of citywide administrative services to the department on or prior to December 31, 2011. A city building constructed after the effective date of this article shall be added to such schedule within 10 years after the issuance of the first certificate of occupancy for such building. Copies of energy efficiency reports submitted to the department with respect to city buildings that are not submitted by the department of citywide administrative services shall also be submitted to the department of citywide administrative services.
  2. A cooperative corporation that owns multiple covered buildings located on different tax block numbers, that is required to file an energy efficiency report for more than one covered building in different calendar years, may consolidate all such energy efficiency reports into one report, disaggregated by covered building, due no later than the year in which the last energy efficiency report would be due, which shall be accepted by the department in satisfaction of the requirements of this section for each covered building included in such consolidated report.

*Section 28-308.4.1 was amended by: Local Law 106 of 2018. This law has an effective date of November 25, 2018.

Related Code Sections


*§28-308.4.1 Maintenance of Buildings, Due Dates
The first energy efficiency reports for covered buildings in existence on the effective date of this article and for new buildings shall be due ...
NYC General Admin. Provisions 2008 > 3 Maintenance of Buildings > 308 *Energy Audits and Retro-Commissioning of Base Building Systems > *§28-308.4 Energy Efficiency Report Required > *§28-308.4.1 Due Dates
*§28-308.4.1 Maintenance of Buildings, Due Dates
The first energy efficiency reports for covered buildings in existence on the effective date of this article and for new buildings shall be due ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 308 Energy Audits and Retro-Commissioning of Base Building Systems > §28-308.4 Energy Efficiency Report Required > *§28-308.4.1 Due Dates
*§28-318.3.3 Maintenance of Buildings, Report and Certificate of Inspection
No later than the due date for such inspection, in accordance with department rules, and no earlier than 60 days before such due date ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 318 Periodic Inspection of Gas Piping Systems > *§28-318.3 Inspection Process > *§28-318.3.3 Report and Certificate of Inspection
*§28-320.6.2 Maintenance of Buildings, Civil Penalty for Failure to File Report
on or before the applicable due date. An owner of a covered building subject to a violation for failure to file a report shall be liable ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > *320 Building Energy and Emissions Limits > *§28-320.6 Penalties > *§28-320.6.2 Civil Penalty for Failure to File Report
§28-308.4 Maintenance of Buildings, Energy Efficiency Report Required
and retro-commissioning prior to the scheduled due date for such report. The commissioner may grant no more than two such extensions of no more than one ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 308 Energy Audits and Retro-Commissioning of Base Building Systems > §28-308.4 Energy Efficiency Report Required
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE