• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

112.5.1 Drywall, Performance Standard

2012 Virginia Construction Code (USBC, Part I) > 1 Administration > 112 Workmanship, Materials and Equipment > 112.5 Defective Materials > 112.5.1 Drywall, Performance Standard
JUMP TO FULL CODE CHAPTER
All newly installed gypsum wallboard shall not be defective drywall as defined in Section 112.5.1.1.1.

112.5.1.1 Remediation Standards

The following provisions establish remediation standards where defective drywall was installed in buildings.

112.5.1.1.1 Definition

For the purposes of this section the term "defective drywall" means gypsum wallboard that (i) contains elemental sulfur exceeding 10 parts per million that when exposed to heat or humidity, or both, emits volatile sulfur compounds in quantities that cause observable corrosion on electrical wiring, plumbing pipes, fuel gas lines, or HVAC equipment, or any components of the foregoing or (ii) has been designated by the U.S. Consumer Product Safety Commission as a product with a product defect that constitutes a substantial product hazard within the meaning of Section 15(a)(2) of the Consumer Product Safety Act (15 USC Section 2064(a)(2)).

112.5.1.1.2 Permit

Application for a permit shall be made to the building official and a permit shall be obtained prior to the commencement of remediation work undertaken to remove defective drywall from a building and for the removal, replacement, or repair of corroded electrical, plumbing, mechanical, or fuel gas equipment and components.

112.5.1.1.3 Protocol

Where remediation of defective drywall is undertaken, the following standards shall be met. The building official shall be permitted to consider and approve modifications to these standards in accordance with Section 106.3.

112.5.1.1.3.1 Drywall

Drywall in the building, whether defective or nondefective, shall be removed and discarded, including fasteners that held any defective drywall to prevent small pieces of drywall from remaining under fasteners.

Exceptions:

  1. Nondefective drywall not subject to the corrosive effects of any defective drywall shall be permitted to be left in place in buildings where the defective drywall is limited to a defined room or space or isolated from the rest of the building and the defective drywall can be positively identified. If the room or space containing the defective drywall also contains any nondefective drywall, the nondefective drywall in that room or space shall also be removed.
  2. In multi-family buildings where defective drywall was not used in the firewalls between units and there are no affected building systems behind the firewalls, the firewalls shall be permitted to be left in place.

112.5.1.1.3.2 Insulation and Other Building Components

Insulation in walls and ceilings shall be removed and discarded. Carpet and vinyl flooring shall be removed and discarded. Woodwork, trim, cabinets, and tile or wood floors may be left in place or may be reused.

Exceptions:

  1. Closed-cell foam insulation is permitted to be left in place if testing for off-gassing from defective drywall is negative, unless its removal is required to gain access.
  2. Insulation, carpet, or vinyl flooring in areas not exposed to defective drywall or to the effects of defective drywall, may be left in place or reused.

112.5.1.1.3.3 Electrical Wiring, Equipment, Devices, and Components

All electrical wiring regulated by this code shall be permitted to be left in place, but removal or cleaning of exposed ends of the wiring to reveal clean or uncorroded surfaces is required. All electrical equipment, devices, and components of the electrical system of the building regulated by this code shall be removed and discarded. This shall include all smoke detectors.

Exceptions:

  1. Electrical equipment, devices, or components in areas not exposed to the corrosive effects of defective drywall shall be permitted to be left in place or reused. Electrical equipment, devices, or components in areas exposed to the corrosive effects of defective drywall shall be cleaned, repaired, or replaced.
  2. Cord and plug connected appliances are not subject to this code and, therefore, cannot be required to be removed or replaced.

Note: All low voltage wiring associated with security systems, door bells, elevator controls, and other such components shall be removed and replaced or repaired.

112.5.1.1.3.4 Plumbing and Fuel Gas Piping, Fittings, Fixtures, and Equipment

All copper fuel gas piping and all equipment utilizing fuel gas with copper, silver, or aluminum components shall be removed and discarded. All copper plumbing pipes and fittings shall be removed and discarded. Plumbing fixtures with copper, silver, or aluminum components shall be removed and discarded.

Exception: Plumbing or fuel gas piping, fittings, fixtures, equipment, or components in areas not exposed to the corrosive effects of defective drywall shall be permitted to be left in place or reused.

112.5.1.1.3.5 Mechanical Systems

All heating, air-conditioning, and ventilation system components, including, but not limited to, ductwork, air-handling units, furnaces, heat pumps, refrigerant lines, and thermostats and associated wiring, shall be removed and discarded.

Exception: Mechanical system components in areas not exposed to the corrosive effects of defective drywall shall be permitted to be left in place or reused.

112.5.1.1.3.6 Cleaning

Following the removal of all materials and components in accordance with Sections 112.5.1.1.3.1 through 112.5.1.1.3.5, the building shall be thoroughly cleaned to remove any particulate matter and dust.

112.5.1.1.3.7 Airing Out

Following cleaning in accordance with Section 112.5.1.1.3.6, the building shall be thoroughly aired out with the use of open windows and doors and fans.

112.5.1.1.3.8 Pre-Rebuilding Clearance Testing

Following the steps outlined above for removal of all materials and components, cleaning and airing out, a pre-rebuilding clearance test shall be conducted with the use of copper or silver coupons and the methodology outlined in the April 2, 2010, joint report by the Consumer Products Safety Commission and the Department of Housing and Urban Development "Interim Remediation Guidance for Homes with Corrosion from Problem Drywall" or with the use of a copper probe and dosimeter. The clearance testing shall confirm that all airborne compounds associated with the defective drywall are at usual environmental background levels. The clearance testing report, certifying compliance, shall be submitted to the building official.

Notes:

  1. Where the building is served by a well and prior to conducting clearance tests, all outlets in piping served by the well should be capped or otherwise plugged to prevent contamination of the air sample.
  2. To prevent siphoning and evaporation of the trap seals, fixtures should be capped or otherwise plugged to prevent sewer gases from contaminating the air sample.

112.5.1.1.3.9 Testing Agencies and Personnel

Agencies and personnel performing pre-rebuilding or post-rebuilding clearance testing shall be independent of those responsible for all other remediation work and the agencies and personnel shall be appropriately certified or accredited by the Council of Engineering and Scientific Specialty Boards, the American Indoor Air Quality Council, or the World Safety Organization.

Exception: Testing agencies and personnel shall be accepted if certified by an RDP or if the agency employs an RDP to be in responsible charge of the work.

112.5.1.1.3.10 Rebuilding Standards

The rebuilding of the building shall comply with the edition of the USBC that was in effect when the building was originally built.

112.5.1.1.3.11 Post-Rebuilding Clearance Testing

A post-rebuilding clearance test prior to reoccupancy of the building or structure shall be conducted with the use of copper or silver coupons and the methodology outlined in the April 2, 2010, joint report by the Consumer Products Safety Commission and by the Department of Housing and Urban Development "Interim Remediation Guidance for Homes with Corrosion from Problem Drywall" or with the use of a copper probe and dosimeter. The clearance testing shall confirm that all airborne compounds associated with the defective drywall are at usual environmental background levels. The clearance testing report certifying compliance shall be submitted to the building official.

Notes:

  1. Where the building is served by a well and prior to conducting clearance tests, all outlets in piping served by the well should be capped or otherwise plugged to prevent contamination of the air sample.
  2. To prevent siphoning and evaporation of the trap seals, fixtures should be capped or otherwise plugged to prevent sewer gases from contaminating the air sample.

112.5.1.1.4 Final Approval by the Building Official

Once remediation has been completed in accordance with this section, a certificate or letter of approval shall be issued by the building official. The certificate or letter shall state that the remediation and rebuilding is deemed to comply with this code.

112.5.1.1.4.1 Approval of Remediation Occurring Prior to These Standards

The building official shall issue a certificate or letter of approval for remediation of defective drywall that occurred prior to the effective date of these standards provided post-rebuilding clearance testing has been performed in accordance with Section 112.5.1.1.3.11, by agencies and personnel complying with Section 112.5.1.1.3.9, and the clearance testing confirms that all airborne compounds associated with the defective drywall are at usual environmental background levels. The clearance testing report certifying compliance shall be submitted to the building official.

Related Code Sections


112.5.1 Administration, Drywall, Performance Standard
The following provisions establish remediation standards where defective drywall was installed ...
2012 Virginia Construction Code (USBC, Part I) > 1 Administration > 112 Workmanship, Materials and Equipment > 112.5 Defective Materials > 112.5.1 Drywall, Performance Standard
112.5.1.1.1 Administration, Definition
For the purposes of this section the term "defective drywall" means gypsum wallboard that (i) contains elemental sulfur exceeding 10 parts per ...
2012 Virginia Construction Code (USBC, Part I) > 1 Administration > 112 Workmanship, Materials and Equipment > 112.5 Defective Materials > 112.5.1 Drywall, Performance Standard > 112.5.1.1 Remediation Standards > 112.5.1.1.1 Definition
112.5.1.1.3.2 Administration, Insulation and Other Building Components
if testing for off-gassing from defective drywall is negative, unless its removal is required to gain access. Insulation, carpet, or vinyl flooring in areas ...
2012 Virginia Construction Code (USBC, Part I) > 1 Administration > 112 Workmanship, Materials and Equipment > 112.5 Defective Materials > 112.5.1 Drywall, Performance Standard > 112.5.1.1 Remediation Standards > 112.5.1.1.3 Protocol > 112.5.1.1.3.2 Insulation and Other Building Components
112.5.1.1.3.10 Administration, Rebuilding Standards
The rebuilding of the building shall comply with the edition of the USBC that was in effect when the building was originally built ...
2012 Virginia Construction Code (USBC, Part I) > 1 Administration > 112 Workmanship, Materials and Equipment > 112.5 Defective Materials > 112.5.1 Drywall, Performance Standard > 112.5.1.1 Remediation Standards > 112.5.1.1.3 Protocol > 112.5.1.1.3.10 Rebuilding Standards
112.5.1.1.3.3 Administration, Electrical Wiring, Equipment, Devices, and Components
not exposed to the corrosive effects of defective drywall shall be permitted to be left in place or reused. Electrical equipment, devices ...
2012 Virginia Construction Code (USBC, Part I) > 1 Administration > 112 Workmanship, Materials and Equipment > 112.5 Defective Materials > 112.5.1 Drywall, Performance Standard > 112.5.1.1 Remediation Standards > 112.5.1.1.3 Protocol > 112.5.1.1.3.3 Electrical Wiring, Equipment, Devices, and Components
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE