1809.4.1 Driving Near Fresh Concrete
Related Code Sections
1809.4.1 Soils and Foundations, Driving Near Fresh Concrete
Piles shall not be driven adjacent to fresh concrete that is less than 3 days old without approval by the engineer ...
NYC Building Code 2014 > 18 Soils and Foundations > 1809 Driven Piles > 1809.4 Installation of Driven Piles > 1809.4.1 Driving Near Fresh Concrete
1808.2.8.2 Soils and Foundations, Driving Criteria
The allowable compressive load on steel and concrete piles, where determined solely by the application of an approved wave equation analyses, shall ...
NYC Building Code 2008 > 18 Soils and Foundations > 1808 Pier and Pile Foundations > 1808.2 Piers and Piles—General Requirements > 1808.2.8 Allowable Pier or Pile Loads > 1808.2.8.2 Driving Criteria
1905.12 Concrete, Cold Weather Requirements
Concrete that is to be placed during freezing or near-freezing weather shall comply with the following: Adequate equipment shall be provided ...
NYC Building Code 2014 > 19 Concrete > 1905 Concrete Quality, Mixing and Placing > 1905.12 Cold Weather Requirements
§27-710 Foundations, Compacted Concrete Piles
into the drive casing and anchored to the expanded base by placing a fresh charge of concrete in the shell and driving it into the base. The shell may ...
NYC 1968 Code (Vol I) > 11 Foundations > 10 Pile Types--Specific Requirements > §27-710 Compacted Concrete Piles
1905.6.1 Concrete, Qualified Technicians
Concrete shall be tested in accordance with the requirements in Sections 1905.6.2 through 1905.6.5. An approved agency shall perform tests on fresh ...
NYC Building Code 2008 > 19 Concrete > 1905 Concrete Quality, Mixing and Placing > 1905.6 Evaluation and Acceptance of Concrete > 1905.6.1 Qualified Technicians