// CODE SNIPPET
5607.9 Drill Holes
JUMP TO FULL CODE CHAPTER
Holes drilled for the loading of explosive charges shall be made and loaded in accordance with NFPA 495.
No holes shall be loaded except those to be fired in the next round of blasting. After loading, all remaining explosives shall be immediately returned to proper storage.
Drill holes which have contained explosives shall not be re-drilled.
Related Code Sections
5607.9 Explosives and Fireworks, Drill Holes
Holes drilled for the loading of explosive charges shall be made and loaded in accordance with NFPA 495 ...
5607.9 Explosives and Fireworks, Drill Holes
Holes drilled for the loading of explosive charges shall be made and loaded in accordance with NFPA 495 ...
1810.4.10 Soils and Foundations, Micropiles
Micropile deep foundation elements shall be permitted to be formed in holes advanced by rotary or percussive drilling methods, with or without casing ...
California Building Code 2016 (Vol 1 & 2) > 18 Soils and Foundations > 1810 Deep Foundations > 1810.4 Installation > 1810.4.10 Micropiles
1810.4.10 Soils and Foundations, Micropiles
Micropile deep foundation elements shall be permitted to be formed in holes advanced by rotary or percussive drilling methods, with or without casing ...
California Building Code 2019 (Vol 1 & 2) > 18 Soils and Foundations > 1810 Deep Foundations > 1810.4 Installation > 1810.4.10 Micropiles
1810A.4.10 Soils and Foundations, Micropiles
Micropile deep foundation elements shall be permitted to be formed in holes advanced by rotary or percussive drilling methods, with or without casing ...
California Building Code 2016 (Vol 1 & 2) > 18A Soils and Foundations > 1810A Deep Foundations > 1810A.4 Installation > 1810A.4.10 Micropiles