// CODE SNIPPET
§28-308.3.3 Documentation of Retro-Commissioning
JUMP TO FULL CODE CHAPTER
A copy of the latest up-to-date equipment manuals and the most recent retro-commissioning report shall be maintained at every covered building and shall be made available upon request for inspection by the department.
Related Code Sections
*§28-308.3.3 Maintenance of Buildings, Documentation of Retro-Commissioning
A copy of the latest up-to-date equipment manuals and the most recent retro-commissioning report shall be maintained at every covered building ...
NYC General Admin. Provisions 2008 > 3 Maintenance of Buildings > 308 *Energy Audits and Retro-Commissioning of Base Building Systems > *§28-308.3 Retro-Commissioning Required > *§28-308.3.3 Documentation of Retro-Commissioning
§28-308.3.3 Maintenance of Buildings, Documentation of Retro-Commissioning
A copy of the latest up-to-date equipment manuals and the most recent retro-commissioning report shall be maintained at every covered building ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 308 Energy Audits and Retro-Commissioning of Base Building Systems > §28-308.3 Retro-Commissioning Required > §28-308.3.3 Documentation of Retro-Commissioning
§28-308.3.2 Maintenance of Buildings, Timing of Retro-Commissioning
Except as otherwise provided in section 28-308.7, the retro-commissioning shall be completed no earlier than four years prior to the date on which ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 308 Energy Audits and Retro-Commissioning of Base Building Systems > §28-308.3 Retro-Commissioning Required > §28-308.3.2 Timing of Retro-Commissioning
*§28-308.3.1 Maintenance of Buildings, Contents of Retro-Commissioning Report
The retro-commissioning agent shall prepare and certify a retro-commissioning report. The retro-commissioning report shall include such information ...
NYC General Admin. Provisions 2008 > 3 Maintenance of Buildings > 308 *Energy Audits and Retro-Commissioning of Base Building Systems > *§28-308.3 Retro-Commissioning Required > *§28-308.3.1 Contents of Retro-Commissioning Report
*§28-308.4.2 Maintenance of Buildings, Combined Audit and Retro-Commissioning
Nothing in this article shall prevent an owner from performing the audit and the retro-commissioning in a combined process, provided that all ...
NYC General Admin. Provisions 2008 > 3 Maintenance of Buildings > 308 *Energy Audits and Retro-Commissioning of Base Building Systems > *§28-308.4 Energy Efficiency Report Required > *§28-308.4.2 Combined Audit and Retro-Commissioning