115.2 Division of Industrial Compliance Schedule of Fees
The fees for examination and processing of construction documents when required to be submitted to the division of industrial compliance, except medical gas piping systems and temporary structures, shall be in accordance with Table 115.2. The filing process for an application for plan approval specified in Section 107.2 will not be considered complete until the applicable fees have been paid in accordance with Table 115.2.
Exception: Fees for alteration or change of occupancy as determined by the building official shall be based on the actual area affected by the alteration or change of occupancy which may extend beyond the limits of construction.
SCOPE OF WORK | PROCESSING FEE | FEE FOR PLANS EXAMINATION AND A MINIMUM OF FIVE INSPECTIONS |
(1) Structural | $275.00 | $10.50/100 sq. ft. gross area of each floor level |
(2) Mechanical | $275.00 | $6.50/100 sq. ft. gross area of each floor level |
(3) Electrical | $275.00 | $6.50/100 sq. ft. gross area of each floor level |
(4) Fire alarm systems | $275.00 | $6.50 per device |
(5) Automatic sprinkler and other fire suppression systems (all suppressed areas) | $275.00 | $6.50/100 sq. ft. gross area of each floor level |
(6) Industrial unit | $200.00 | $1.75/100 sq. ft. gross area of each floor level |
The division of industrial compliance may establish a written policy for the maximum number of inspections required by Sections 108.2 and 105.1.5 that may be included in the fees set forth in Table 115.2. Inspections in excess of the maximum number established by the division of industrial compliance shall be subject to fee of one hundred fifty dollars per inspection.
The fees set forth in Table 115.2 shall include one initial plan review and up to two resubmission plan reviews to resolve issues resulting from correction letters. The fee for plan review after the second resubmission shall be of one hundred dollars for each additional resubmission.
The processing fee for re-stamping additional sets of construction documents after initial plan approval shall be one hundred dollars.
The processing fee for amended construction documents submitted to the division of industrial compliance in accordance with Section 106.3 shall be two hundred fifty dollars. The fee for plans examination of amended construction documents submitted to the division of industrial compliance in accordance with Section 106.3 shall be one hundred dollars per hour for each submission.
The fees for plan examination and processing of a phased plan approval request per Section 105.1.4 shall be in accordance with Table 115.2 and Section 115.2.1 for the initial phase submission of each scope of work. The processing fee for plan examination of each subsequent phase of submission shall be two hundred fifty dollars.