• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1910.211(d)(19) Die Builder

OSHA 1910 General Industry > O Machinery and Machine Guarding > 1910.211 Definitions > 1910.211(d) > 1910.211(d)(19) Die Builder
JUMP TO FULL CODE CHAPTER
Die builder means any person who builds dies for power presses.

Related Code Sections


1910.211(d)(19) Machinery and Machine Guarding, Die Builder
Die builder means any person who builds dies for power presses ...
OSHA 1910 General Industry > O Machinery and Machine Guarding > 1910.211 Definitions > 1910.211(d) > 1910.211(d)(19) Die Builder
1910.211(d)(23) Machinery and Machine Guarding, Die Shoe
Die shoe means a plate or block upon which a die holder is mounted. A die shoe functions primarily as a base for the complete die assembly, and, when ...
OSHA 1910 General Industry > O Machinery and Machine Guarding > 1910.211 Definitions > 1910.211(d) > 1910.211(d)(23) Die Shoe
1910.217(d)(7) Machinery and Machine Guarding, Die Fastening
Provision shall be made in both the upper and lower shoes for securely mounting the die to the bolster and slide. Where clamp caps or setscrews ...
OSHA 1910 General Industry > O Machinery and Machine Guarding > 1910.217 Mechanical Power Presses > 1910.217(d) Design, Construction, Setting and Feeding of Dies > 1910.217(d)(7) Die Fastening
1910.217(d)(8) Machinery and Machine Guarding, Die Handling
Handling equipment attach points shall be provided on all dies requiring mechanical handling ...
OSHA 1910 General Industry > O Machinery and Machine Guarding > 1910.217 Mechanical Power Presses > 1910.217(d) Design, Construction, Setting and Feeding of Dies > 1910.217(d)(8) Die Handling
1910.211 Machinery and Machine Guarding, Definitions
Die builder means any person who builds dies for power presses ...
OSHA 1910 General Industry > O Machinery and Machine Guarding > 1910.211 Definitions
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE