UpCodes logo
Go To Full Code Chapter
Installers shall furnish satisfactory evidence that the appliance is constructed in accordance with the requirements of this code. The permanently attached label of an approved agency shall be permitted to be accepted as such evidence.

Related Code Sections

301.3 General Regulations, Design of Equipment
Installers shall furnish satisfactory evidence that the appliance is constructed in accordance with the requirements of this code. The permanently ...
L 501.0 Sustainable Practices, Water Heating Design, Equipment, and Installation
] Where used to maintain storage tank water temperature, recirculating pumps shall be equipped with controls limiting operation to a period from ...
L 501.6 Sustainable Practices, System Balancing
Systems with multiple recirculation zones shall be balanced to distribute hot water uniformly, or they shall be operated with a pump for each zone ...
L 501.7 Sustainable Practices, Flow Balancing Valves
Flow balancing valves shall be a factory preset automatic flow control valve, a flow regulating valve, or a balancing valve with memory stop ...