• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

3305.3.2.1 Design Drawings

NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3305 Material Placement and Installation > 3305.3 Concrete Formwork > 3305.3.2 Design of Concrete Formwork > 3305.3.2.1 Design Drawings
JUMP TO FULL CODE CHAPTER
Site-specific formwork design drawings prepared by a registered design professional shall be required in the following cases:
  1. For concrete formwork in a structure classified as a major building; or
  2. Wherever the shore or form height exceeds 14 feet (4267 mm); or
  3. Wherever the total vertical load on the forms exceeds 150 pounds per square foot (732 kg/m2); or
  4. Wherever power buggies are used; or
  5. Wherever multi-stage shores are used; or
  6. Wherever the slab thicknesses or beam heights equal or exceed 10 inches; or
  7. Wherever there are concentrated loads exceeding 2000 pounds (907 kg) imposed on the formwork; or
  8. Wherever there are loads imposed on existing structures in accordance with Section 3305.3.1.2.1.
Exception: Design drawings prepared by a registered design professional are not required for formwork installed in conjunction with slabs supported directly on grade or footings where such slab or footing does not impart any load on an adjacent structure.

Related Code Sections


3305.3.2.1 Safeguards During Construction or Demolition, Design Drawings
Site-specific formwork design drawings prepared by a registered design professional shall be required in the following cases: For concrete formwork ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3305 Material Placement and Installation > 3305.3 Concrete Formwork > 3305.3.2 Design of Concrete Formwork > 3305.3.2.1 Design Drawings
2210.3.2 Steel, Truss Design Drawings
The truss design drawings shall conform to the requirements of Section B2.3 of AISI S214 and shall be provided with the shipment of trusses delivered ...
NYC Building Code 2014 > 22 Steel > 2210 Cold-Formed Steel Light-Frame Construction > 2210.3 Trusses > 2210.3.2 Truss Design Drawings
2303.4.1 Wood, Truss Design Drawings
Truss construction documents shall be prepared by a registered design professional and shall be provided to the commissioner and approved prior ...
NYC Building Code 2008 > 23 Wood > 2303 Minimum Standards and Quality > 2303.4 Trusses > 2303.4.1 Truss Design Drawings
2303.4.1.1 Wood, Truss Design Drawings
individual truss shall be provided to the commissioner and approved prior to installation. Truss design drawings shall also be provided with the shipment ...
NYC Building Code 2014 > 23 Wood > 2303 Minimum Standards and Quality > 2303.4 Trusses > 2303.4.1 Design > 2303.4.1.1 Truss Design Drawings
3314.10.1 Safeguards During Construction or Demolition, Suspended Elements to Be Kept Vertical and Parallel
provided such occurs in accordance with design drawings prepared by a registered design professional. Such design drawings shall be based ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.10 Suspended Scaffold > 3314.10.1 Suspended Elements to Be Kept Vertical and Parallel
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE