// CODE SNIPPET
511.2.2.2 Department Acceptance Test
JUMP TO FULL CODE CHAPTER
Upon successful completion of the commissioning test, the owner shall submit to the department a detailed report of the results of the commissioning test and request a department acceptance test. The department acceptance test shall serve to demonstrate the system is functioning satisfactorily and is ready for department use. The in-building auxiliary radio communication system shall be demonstrated in the presence of a department representative by a representative of the owner. Upon satisfactory completion of the department acceptance test, the department shall issue a permit for such system.
Related Code Sections
§27-977 Fire Alarm, Detection and Extinguishing Equipment, Fire Systems Electrical Tests
of operation of all the components in the system and to an acceptance test by the fire department ...
NYC 1968 Code (Vol I) > 17 Fire Alarm, Detection and Extinguishing Equipment > 5 Interior Fire Alarm and Signal System > §27-977 Fire Systems Electrical Tests
Appendix A Selected Rules of the Department of Buildings [PDF] (page 60)
for the scope of testing performed, who shall personally supervise the testing of materials or service equipment for acceptance by the Department ...
Appendix A Selected Rules of the Department of Buildings [PDF] (page 7)
by the Commissioner of the Department of Buildings (the "department"). (b) Filing of applications. (1) All applications for acceptance of material or equipment ...
1114.2.2.2 Storm Drainage, Permeability Tests
by the New York City Department of Environmental Protection and accepted engineering practice ...
NYC Plumbing Code 2014 > 11 Storm Drainage > 1114 Private On-Site Stormwater Disposal Systems > 1114.2 Field Investigation > 1114.2.2 Soil Infiltration Capabilities > 1114.2.2.2 Permeability Tests
§28-304.6.1 Maintenance of Buildings, Inspection and Testing Entities
The required periodic inspections in Table N1 shall be made by the department. The other tests and inspections in Table N1 shall be performed ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 304 Elevators and Conveying Systems > §28-304.6 Inspection and Testing Process > §28-304.6.1 Inspection and Testing Entities