• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

A-305.2.2.3 Demolition Schedule

Philadelphia Administrative Code > 3 Permits > A-305 Construction Documents > A-305.2 Contents > A-305.2.2 Demolition Permits > A-305.2.2.3 Demolition Schedule
JUMP TO FULL CODE CHAPTER
The contractor shall submit a schedule of the proposed demolition which shall include the following:
  1. The start date that is consistent with code requirements for public notice.
  2. Identification of demolition milestones and projected dates of completion.
  3. The proposed start and stop times for daily activity.
  4. Confirmation that the work will not begin before site safety measures are in place and those measures are inspected and approved by the code official.

A-305.2.2.3.1 Revised Demolition Schedule

As soon as practicable, the contractor is required to submit to the Department a revised demolition schedule if the demolition does not start in the time frame established by the schedule submitted with the permit application. Failure to submit the revised demolition schedule shall be a Class II violation.

Related Code Sections


A-305.2.2.3 Permits, Demolition Schedule
The contractor shall submit a schedule of the proposed demolition which shall include the following: The start date that is consistent ...
Philadelphia Administrative Code > 3 Permits > A-305 Construction Documents > A-305.2 Contents > A-305.2.2 Demolition Permits > A-305.2.2.3 Demolition Schedule
3303.1 Safeguards During Construction, Construction Documents
Construction documents and a schedule for demolition shall be submitted where required by the building official . Where such information ...
2018 Philadelphia Building Code > 33 Safeguards During Construction > 3303 Demolition > 3303.1 Construction Documents
Section A-305 Permits, Construction Documents
for protecting adjoining structures, property and pedestrians. A schedule of the demolition activities shall be developed as part of demolition planning ...
Philadelphia Administrative Code > 3 Permits > A-305 Construction Documents
A-402.10.6.2 Inspections, Demolition Progression Inspection
An inspection is required to ensure that the contractor is maintaining all safety measures detailed in the site safety demolition plan and using ...
Philadelphia Administrative Code > 4 Inspections > A-402 Permit Inspections > A-402.10 Required Inspections > A-402.10.6 Demolition Permits > A-402.10.6.2 Demolition Progression Inspection
A-402.10.6 Inspections, Demolition Permits
Specific demolition permit inspections are included in Sections A-402.10.6.1 through A-402.10.6.5, as applicable to the scope of work. UpCodes ...
Philadelphia Administrative Code > 4 Inspections > A-402 Permit Inspections > A-402.10 Required Inspections > A-402.10.6 Demolition Permits
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE