// CODE SNIPPET
1105.8 Defrost
JUMP TO FULL CODE CHAPTER
Where defrost cycles are required for
portions of the system, provisions shall be made for collection
and disposal of the defrost liquid in a safe and sanitary
manner.
Related Code Sections
1105.8 Refrigeration, Defrost
Where defrost cycles are required for
portions of the system, provisions shall be made for collection
and disposal of the defrost liquid in a safe ...
1105.8 Refrigeration, Defrost
Where defrost cycles are required for portions
of the system, provisions shall be made for collection
and disposal of the defrost liquid in a safe ...
A5.207.1.2.2 — Voluntary Standards for Health Facilities [OSHPD 1, 2 & 4],
operation during: Defrost; and Transient periods such as start-ups and following room thermostat setpoint advance, if the controls provide ...
Los Angeles Green Building Code > A6.1 — Voluntary Standards for Health Facilities [OSHPD 1, 2 & 4] > A5.207 [OSHPD 1, 2 & 4] HVAC Design, Equipment and Installation > A5.207.1 Space-Conditioning Equipment Certification by Manufacturers > A5.207.1.2 Controls for Heat Pumps With Supplementary Electric Resistance Heaters > A5.207.1.2.2
A5.207.1.2.2 — Voluntary Standards for Health Facilities [OSHPD 1, 2 & 4],
operation during: Defrost; and Transient periods such as start-ups and following room thermostat setpoint advance, if the controls provide ...
Los Angeles Green Building Code > A6.1 — Voluntary Standards for Health Facilities [OSHPD 1, 2 & 4] > A5.207 [OSHPD 1, 2 & 4] HVAC Design, Equipment and Installation > A5.207.1 Space-Conditioning Equipment Certification by Manufacturers > A5.207.1.2 Controls for Heat Pumps With Supplementary Electric Resistance Heaters > A5.207.1.2.2