§28-104.2.6 Deferred Submittal
Go To Full Code Chapter
With the prior approval of the department, the applicant may defer submittal of portions of the design until a specified period of time after the issuance of a permit. The applicant shall list the deferred submittal items on the initial application for construction document approval. The deferred submittal items shall not be constructed or installed until the design and submittal documents for the item have been approved by the department.
The owner and permit
holder shall proceed at their own risk with the construction operation and without assurance that a
permit for the entire structure will be granted and the approval of all construction documents shall be
conditioned upon and subject to compliance with the requirements of this code and other applicable
laws and rules in effect at the time of issuance of the associated permit or place of assembly certificate
of operation.
Upcodes Diagrams
Related Code Sections
§28-104.2.6 Administration, Deferred Submittal
With the prior approval of the department, the applicant may defer submittal of portions of the design until a specified period of time after ...
§28-104.2.6 Administration, Deferred Submittal
With the prior approval of the department, the applicant may defer submittal of portions of the design until a specified period of time after ...
§28-104.2.6 Administration, Deferred Submittal
With the prior approval of the department, the applicant may defer submittal of portions of the design until a specified period of time after ...
§28-105.12.6 Administration, Deferred Submittals
Where permits are issued subject to deferred submittal of portions of the design as provided for in section 28-104.2.6, the deferred submittal items ...