• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.1101(j)(1)(iii) Decontamination Area Exit Procedures

OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1101 Asbestos > 1926.1101(j) Hygiene Facilities and Practices for Employees > 1926.1101(j)(1) > 1926.1101(j)(1)(iii) Decontamination Area Exit Procedures
JUMP TO FULL CODE CHAPTER
The employer shall ensure that:

1926.1101(j)(1)(iii)(A)

Before leaving the regulated area, employees shall remove all gross contamination and debris from their protective clothing.

1926.1101(j)(1)(iii)(B)

Employees shall remove their protective clothing in the equipment room and deposit the clothing in labeled impermeable bags or containers.

1926.1101(j)(1)(iii)(C)

Employees shall not remove their respirators in the equipment room.

1926.1101(j)(1)(iii)(D)

Employees shall shower prior to entering the clean room.

1926.1101(j)(1)(iii)(E)

After showering, employees shall enter the clean room before changing into street clothes.

Related Code Sections


1926.1101(j)(1)(iii) Toxic and Hazardous Substances, Decontamination Area Exit Procedures
the regulated area, employees shall remove all gross contamination and debris from their protective clothing ...
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1101 Asbestos > 1926.1101(j) Hygiene Facilities and Practices for Employees > 1926.1101(j)(1) > 1926.1101(j)(1)(iii) Decontamination Area Exit Procedures
1926.65(k) Occupational Health and Environmental Controls, Decontamination
— Procedures for all phases of decontamination ...
OSHA 1926 Construction > D Occupational Health and Environmental Controls > 1926.65 Hazardous Waste Operations and Emergency Response > 1926.65(k) Decontamination
1926.65(k)(2) Occupational Health and Environmental Controls, Decontamination Procedures
A decontamination procedure shall be developed, communicated to employees and implemented before any employees or equipment may enter areas on site ...
OSHA 1926 Construction > D Occupational Health and Environmental Controls > 1926.65 Hazardous Waste Operations and Emergency Response > 1926.65(k) Decontamination > 1926.65(k)(2) Decontamination Procedures
1926.1101(j)(1)(i) Toxic and Hazardous Substances, Decontamination Areas
and exit the regulated area through the decontamination area ...
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1101 Asbestos > 1926.1101(j) Hygiene Facilities and Practices for Employees > 1926.1101(j)(1) > 1926.1101(j)(1)(i) Decontamination Areas
1926.65(p)(4) Occupational Health and Environmental Controls, Decontamination Program
The employer shall develop and implement a decontamination procedure meeting the requirements of paragraph (k) of this section ...
OSHA 1926 Construction > D Occupational Health and Environmental Controls > 1926.65 Hazardous Waste Operations and Emergency Response > 1926.65(p) Certain Operations Conducted Under the Resource Conservation and Recovery Act of 1976 (RCRA) > 1926.65(p)(4) Decontamination Program
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE