• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

3308.6.2.9 Dates Tested

NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3308 Protection of Unenclosed Perimeters > 3308.6 Horizontal Safety Netting Systems > 3308.6.2 Horizontal Safety Netting Systems Requirements > 3308.6.2.9 Dates Tested
JUMP TO FULL CODE CHAPTER
The phrase "Dates inspected" in Item 5 of Section 11.4 of ANSI/ASSE A10.11 shall be amended to read "Dates tested".

Related Code Sections


3308.6.2.9 Safeguards During Construction or Demolition, Dates Tested
The phrase "Dates inspected" in Item 5 of Section 11.4 of ANSI/ASSE A10.11 shall be amended to read "Dates tested" ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3308 Protection of Unenclosed Perimeters > 3308.6 Horizontal Safety Netting Systems > 3308.6.2 Horizontal Safety Netting Systems Requirements > 3308.6.2.9 Dates Tested
1905.6.2.4 Concrete, Strength Test
, additional pairs of test cylinders may be taken at the time of sampling for testing at a later date. The additional cylinders may be tested at a later date ...
NYC Building Code 2008 > 19 Concrete > 1905 Concrete Quality, Mixing and Placing > 1905.6 Evaluation and Acceptance of Concrete > 1905.6.2 Frequency of Testing > 1905.6.2.4 Strength Test
§28-304.6.6 Maintenance of Buildings, Repair
All defects as found in such inspection and test reports shall be corrected within 120 days after the date of inspection and test, except all ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 304 Elevators and Conveying Systems > §28-304.6 Inspection and Testing Process > §28-304.6.6 Repair
1905.6.2.4 Concrete, Strength Test
for testing at a later date. The additional cylinders may be tested at a later date should the strength at the specified date not meet the required f' c ...
NYC Building Code 2014 > 19 Concrete > 1905 Concrete Quality, Mixing and Placing > 1905.6 Evaluation and Acceptance of Concrete > 1905.6.2 Frequency of Testing > 1905.6.2.4 Strength Test
1704.8.2 Structural Tests and Special Inspections, Records of Testing of Deep Foundations Elements
, and the date of the testing, including the start and end time. Record the method of performing the test, including the equipment being used, as well ...
NYC Building Code 2014 > 17 Structural Tests and Special Inspections > 1704 Special Inspections > 1704.8 Deep Foundation Elements > 1704.8.2 Records of Testing of Deep Foundations Elements
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE