• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.960(g)(6) Dates

OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.960 Working on or Near Exposed Energized Parts > 1926.960(g) Protection From Flames and Electric Arcs > 1926.960(g)(6) Dates
JUMP TO FULL CODE CHAPTER

1926.960(g)(6)(i)

The obligation in paragraph (g)(2) of this section for the employer to make reasonable estimates of incident energy commences January 1, 2015.

1926.960(g)(6)(iii)

The obligation in paragraph (g)(5) of this section for the employer to ensure that each employee exposed to hazards from electric arcs wears the required arc-rated protective equipment commences April 1, 2015.

1926.960(g)(6)(ii)

The obligation in paragraph (g)(4)(iv) of this section for the employer to ensure that the outer layer of clothing worn by an employee is flame-resistant when the estimated incident heat energy exceeds 2.0 cal/cm2 commences April 1, 2015.

Related Code Sections


1926.1124(o) Toxic and Hazardous Substances, Dates
This standard shall become effective March 10, 2017 ...
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1124 Beryllium > 1926.1124(o) Dates
1926.1126(l) Toxic and Hazardous Substances, Dates
For employers with 20 or more employees, all obligations of this section, except engineering controls required by paragraph (e) of this section ...
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1126 Chromium (VI) > 1926.1126(l) Dates
1926.1153(k) Toxic and Hazardous Substances, Dates
This section shall become effective June 23, 2016 ...
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1153 Respirable Crystalline Silica > 1926.1153(k) Dates
1926.960(g)(6) Electric Power Transmission and Distribution, Dates
The obligation in paragraph (g)(2) of this section for the employer to make reasonable estimates of incident energy commences January 1, 2015 ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.960 Working on or Near Exposed Energized Parts > 1926.960(g) Protection From Flames and Electric Arcs > 1926.960(g)(6) Dates
1926.1101(n)(2)(ii)(A) Toxic and Hazardous Substances, The Date of Measurement
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1101 Asbestos > 1926.1101(n) Recordkeeping > 1926.1101(n)(2) Exposure Measurements > 1926.1101(n)(2)(ii) This Record Shall Include at Least the Following Information: > 1926.1101(n)(2)(ii)(A) The Date of Measurement
Help Contact Us Privacy Terms
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE